The Wasatch Range in winter from Emigration Canyon, Salt Lake County

Licensed Utah General Contractor

General Contractor in West Valley City, Utah

Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects

Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in West Valley City. We file each permit application with the West Valley City Building Inspection Division and request every inspection the permit requires.

What We Build

Remodeling and Construction Services in West Valley City

Every West Valley City project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.

Census Housing Data

42.3 Percent of West Valley City Homes Built before 1980

Of West Valley City's 41,433 housing units, 42.3 percent were built before 1980. The city incorporated that year.

Housing units
41,433
Median year built
1985
Built before 1980
42.3%
Built 2000 or later
24.4%
Owner-occupied
72.1%
Single-family detached
65.8%

Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for West Valley City, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.

Permits and Inspections

Building Permits in West Valley City

Building permit applications go through West Valley City's Online Service Portal. Each document that applies is uploaded as its own PDF, including the complete plan set, the structural calculations, and the energy compliance documents.

West Valley City

West Valley City Building Inspection Division

Field inspections take place Monday through Thursday. The first is at 8 AM and the last at 4:30 PM. The division says a request can usually be accommodated within 24 hours. A major project is assigned a primary and a secondary inspector for the length of construction. West Valley City lists plan review times of 3 to 5 days for a residential remodel, 10 days for a new house, and 3 to 4 weeks for commercial work. We account for them in every project schedule.

Phone
801-963-3283
Address
City Hall, 3600 South Constitution Boulevard
Hours
Monday through Thursday, 7 AM to 6 PM
Portal
Online Service Portal
Building Inspections

Sources: West Valley City, Building Inspections; Apply for a Building Permit.

On a single-family home, West Valley City requires a building permit and inspections for work that includes these items.

  • Retaining walls that hold back more than 4 feet of earth, measured on the low side of the property line
  • Additions of habitable space, garages, carports, or roof projections
  • Adding, altering, or removing interior walls, finishing previously unfinished areas such as basements, converting a room to a new use, or changing the slope of a roof
  • Replacing or adding exterior windows
  • Adding, removing, or altering plumbing fixtures in a way that changes how many the home has, and installing, replacing, or repairing a water heater
  • Adding or removing sections of natural gas line
  • Adding, removing, or altering heating or cooling ductwork, and installing, replacing, or repairing a furnace, boiler, air conditioner, evaporative cooler, heat pump, or baseboard heaters
  • Adding, removing, or altering electrical circuits, or making any change to the service equipment, including the meter, or to a panel
  • Adding a fixed electrical appliance that does not replace a similar one
  • Changing or lowering kitchen cabinets and countertops

At most locations in the city, the division's Design Criteria, effective April 18, 2026, list a 30-inch frost line, Seismic Design Category D, and a 103 mph wind speed for foundation and structural work.

Sources: West Valley City, Permit Requirements; Design Criteria, effective April 18, 2026.

Accessory Dwelling Units

ADU Rules in West Valley City

Ordinance 26-28, adopted June 23, 2026, amended West Valley City's internal ADU standards in Section 7-7-115.5 and enacted Section 7-7-107.5 for detached units. Together, the two sections set these requirements.

  • One ADU, internal or detached, on a parcel with a single-unit dwelling
  • For an internal ADU, no separate utility meter and no change to the home's appearance as a single-unit dwelling
  • For an internal ADU, at least one additional on-site parking space outside the front yard setback, with garage spaces the unit displaces replaced in a garage and carport spaces replaced in a carport
  • No internal ADU in a mobile home, and a business license to rent an internal ADU
  • Internal ADU rentals of at least 30 consecutive days
  • No internal ADU in a single-unit dwelling that is not occupied as the primary residence of its owner of record
  • No internal ADU on a lot of 6,000 square feet or less, or in a single-unit dwelling east of 4000 West
  • For a detached ADU, a lot of at least 11,000 square feet that contains a single-unit dwelling and lies in a zone that allows single-unit dwellings
  • No detached ADU on a lot without adequate access to required utilities, or where the utility system lacks the capacity to add the unit
  • A detached unit that complies with the building, health, and fire codes
  • A detached unit in the side or rear yard, smaller than the house, and outside public utility easements
  • Setbacks of at least 5 feet from the side and rear property lines for a unit entirely in the rear yard of a residential zone, and 10 feet in an agricultural zone, with a unit in a side yard held to the zone's side and rear yard requirements for a primary building
  • A setback of at least 20 feet from any property line along a street
  • The height and area standards for accessory buildings
  • A roof pitch, exterior materials, and colors consistent with the house
  • The owner living in the house or the detached unit
  • Conversion of a legally built accessory building only when the structure meets the required setbacks; it complies with the building, health, and fire codes; and the conversion is done under a building permit
  • At least two on-site parking spaces outside the front yard setback for a detached unit of 650 square feet or more, and at least one below that size
  • No more than 25 percent of a rear yard covered by a detached unit and every other accessory building there
  • Rentals of a detached unit for at least 90 consecutive days under a business license

Utah's ADU statutes apply in West Valley City as well, as our ADU page explains.

Source: West Valley City, Ordinance 26-28, Sections 7-7-115.5 and 7-7-107.5. We confirm the lot size and where the parcel sits relative to 4000 West before an ADU is designed.

Utah ADU Law and Building Code
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

West Valley City and Salt Lake County

Under a mutual aid agreement, the Greater Salt Lake Municipal Services District, West Jordan, and Sandy can provide building inspections when West Valley City cannot fill a request made with three or more days' notice. Beyond West Valley City, our Salt Lake County page explains which office issues the permit for an address and lists every community we serve there.

Salt Lake County Permits and Communities

What Homeowners Ask

West Valley City Remodeling and Permit Questions

Can I add a basement apartment in West Valley City?

Only if the home is a single-unit dwelling west of 4000 West, sits on a lot larger than 6,000 square feet, and is occupied as the primary residence of its owner of record. East of 4000 West, the city's code allows a detached ADU instead, on a lot of at least 11,000 square feet and under the standards listed above.

Does the Overpressure Zone apply to a new home in West Valley City?

It can, in the southwest corner of the city. West Valley City's design criteria note that its Overpressure Zone ordinance may apply to new structures there. The criteria give 801-963-3519 as the number for confirming whether it applies. The city's zoning ordinance defines overpressure as "a sudden increase in air pressure resulting from an explosion traveling at the speed of sound." We confirm whether the zone applies to your lot before a new home is designed.

What does West Valley City require for a kitchen remodel permit?

The city asks for plans that show the wall layout, any walls to be removed, and the location of every window and electrical receptacle. Its kitchen remodel requirements also call for GFCI protection and two 20-amp breakers serving all countertop space, no point along the counter's wall line more than 24 inches from a receptacle, and a 4-prong outlet for a new range.

How is power restored after an electrical service upgrade in West Valley City?

A power-to-panel inspection can be specially arranged with at least 48 hours' notice. For an existing home, the city coordinates its inspection with Rocky Mountain Power to keep the outage short. Once an inspector approves the work, the city contacts Rocky Mountain Power and authorizes power to the installation.

What is West Valley City's Contractor Verification Form?

It lists the general, plumbing, mechanical, and electrical contractors under the names on their state licenses, with each one's license number and signature. The city requires it before clearing power or issuing a certificate of occupancy. A form that is not completed correctly is returned.

Does a new home in West Valley City need a landscape agreement?

Yes, at the final inspection. The agreement names who is responsible for installing the landscaping, which the city requires within one year of occupancy.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation in West Valley City

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation