The Wasatch Range in winter from Emigration Canyon, Salt Lake County

Licensed Utah General Contractor

General Contractor in South Jordan, Utah

Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects

Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in South Jordan. We file each permit application with the South Jordan Building Department and request every inspection the permit requires.

What We Build

Remodeling and Construction Services in South Jordan

Every South Jordan project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.

Census Housing Data

70.3 Percent of South Jordan Homes Built in 2000 or Later

Of South Jordan's 27,365 housing units, 70.3 percent were built in 2000 or later. South Jordan's median year built is 2007.

Housing units
27,365
Median year built
2007
Built before 1980
8.7%
Built 2000 or later
70.3%
Owner-occupied
81.4%
Single-family detached
71.0%

Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for South Jordan, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.

Permits and Inspections

Building Permits in South Jordan

In South Jordan, applications and inspection requests go through the city's Online Portal.

South Jordan

South Jordan Building Department

The department's published documents include Basement Finish Code Requirements, a plan checklist for basement finishes and residential remodels, and a Basement Plan Review.

Phone
801-446-4357
Portal
Online Portal
Building Department

Accessory Dwelling Units

ADU Rules in South Jordan

South Jordan's ADU guide, updated in September 2026, lists these conditions. The guide states that it does not include the requirements for ADUs in Daybreak, where ADUs are permitted only above a detached or semi-detached garage.

  • Any ADU limits in a development agreement that existed before May 6, 2026, which remain in effect under the state ADU statute
  • An ADU permit for every detached ADU and for an internal ADU that will be rented, approved before the building permit
  • A notarized affidavit with the building permit submittal for an internal ADU that will not be rented
  • Rentals of 30 calendar days or more
  • An ADU affidavit recorded with the Salt Lake County Recorder as part of the ADU application
  • A lot of at least 6,000 square feet in a zone where single-family homes are a permitted use
  • Lot coverage within the zone's maximum: 20 percent in the A-5 zone; 30 percent in A-1; 40 percent in R-1.8, R-2.5, R-3, and R-4; 50 percent in R-5; and 60 percent in R-M
  • For an internal ADU, the setbacks and building height of the zone
  • At least one off-street parking space that does not block the parking the home requires
  • For an internal ADU, no exterior door on the front of the house, and a street-side entrance set at least 75 percent below grade or screened by a 6-foot fence
  • Owner occupancy of the home, or of either the home or the unit for a detached ADU
  • No separate meters, mailboxes, or addresses
  • One ADU of any type per lot
  • A detached unit at least 10 feet from a property line plus 1 foot for each foot of height over 16 feet; no more than 5 feet taller than the home, up to 25 feet; and no larger than half the home's living space or 1,500 square feet, whichever is less
  • For a detached ADU, a design consistent with the home
  • For a detached ADU, windows and exterior doors serving a floor more than 4 feet above finish grade located at least 20 feet from the property line, positioned with the bottom of the window at least 7 feet above the floor, or located on a facade rotated at least 80 degrees away from a property line
  • For a detached ADU, no roof terrace, deck, balcony, exterior staircase, or other elevated occupiable outdoor space within 20 feet of a property line

Utah's ADU statutes apply in South Jordan as well, as our ADU page explains.

Source: South Jordan, ADU Guide. We recheck the guide for your address before design.

Utah ADU Law and Building Code
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

South Jordan and Salt Lake County

Beyond South Jordan, our Salt Lake County page explains which office issues the permit for an address and lists every community we serve there.

Salt Lake County Permits and Communities

What Homeowners Ask

South Jordan Remodeling and Permit Questions

Can I build an ADU in Daybreak?

Yes, but only above a detached or semi-detached garage, under South Jordan's ADU guide. Parking is set by the Daybreak Development Standards Matrix.

How large can a detached ADU be in South Jordan?

Half of the main home's living space or 1,500 square feet, whichever is smaller. The unit sits at least 10 feet from every property line, plus 1 foot of setback for each foot of height over 16 feet, and rises no more than 5 feet above the home, with 25 feet as the cap.

Do I need an ADU permit in South Jordan if I will not rent the unit?

Not for an internal unit you will not rent. The building permit submittal instead includes a notarized affidavit stating that the space with its own kitchen and bathroom will not be rented out.

Which office issues building permits in South Jordan?

The South Jordan Building Department issues them through its Online Portal. The department's number is 801-446-4357.

Does South Jordan publish basement finish requirements?

Yes. The Building Department publishes Basement Finish Code Requirements and a Basement Plan Review. We follow both when we draw your layout.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation in South Jordan

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation