Licensed Utah General Contractor
General Contractor in Newton, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Newton. We file each permit application with Newton Town Hall and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Newton
Every Newton project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
62.1 Percent of Newton Homes Built before 1980
Of Newton's 248 housing units, 62.1 percent were built before 1980, including 33.5 percent before 1960. Newton's median year built is 1975. Single-family detached homes make up 94.8 percent of Newton's housing.
- Housing units
- 248
- Median year built
- 1975
- Built before 1980
- 62.1%
- Built 2000 or later
- 22.2%
- Owner-occupied
- 86.1%
- Single-family detached
- 94.8%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Newton, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Newton
The Town of Newton issues its own building permits and takes every application on City Inspect. It contracts plan review and inspections through Hyde Park.
Newton
Newton Town Hall
Under Section 11-4-4 of the town's Land Use Ordinance, a permitted use takes effect only once the Planning Commission has issued a zoning clearance and the building inspector or town clerk has granted any building permit or business license it requires. The town's permit procedure lists the Hyde Park City Offices, at 113 East Center in Hyde Park, for plan review and inspections. An inspection is scheduled by calling extension 25 there or requested on City Inspect.
- Town Hall
- 435-563-9283
- Plan Review
- 435-563-6507
- Inspections
- 435-563-6507 ext. 25
- Address
- 51 South Center
- Portal
- City Inspect
The town's procedure lists these items a building permit application may require, in its own order.
- Building plans drawn to scale, with exterior elevations, floor plans, a foundation plan, framing detail, a cross-section, stair detail, an electrical plan, and a plumbing and heating plan
- A model energy code analysis for new home construction
- A site plan showing the building, the property lines, and the setbacks
- Proof of ownership or a county plat map
- A notarized owner-builder form, where one applies
For new home construction, the procedure adds a septic tank permit from the Bear River Health Department and proof of a Newton secondary water share, shown by a copy of its certificate. Under Section 11-4-5 of the Land Use Ordinance, the land use authority also confirms that a permitted use meets all requirements of the Bear River Health Department and of any state departments that apply.
Sources: Newton, Procedure for Newton Town Building Permit Application; Newton Town Land Use Ordinance, Title 11; Contacts; Cache County Building Division.
Accessory Dwelling Units
ADU Rules in Newton
The Town of Newton treats an ADU as an accessory apartment: a subordinate unit within a single-family detached home or its detached garage, allowed as a conditional use in the A-1, R-1, and C-1 zones. Section 11-7-2(D) of its Land Use Ordinance sets these requirements, in its own order.
- No accessory apartment constructed on a lot ahead of the single-family dwelling
- An apartment attached to or within an existing single-family dwelling, or the garage associated with that dwelling
- An apartment subordinate in size to the single-family dwelling
- An appropriately sized septic system shared by the accessory apartment and the single-family dwelling
- In the commercial zone, an accessory apartment attached to or within an existing, approved commercial business
Under Section 11-4-7, no building permit or other permit or license is issued for a conditional use until a conditional use permit has been approved.
The Newton Town Planning Commission's agenda for October 15, 2026, included a review of an internal accessory dwelling unit code.
Utah's ADU statutes apply in Newton as well, as our ADU page explains.
Sources: Newton Town Land Use Ordinance, Title 11; Document Center; Planning Commission agenda, October 15, 2026; Utah Code 10-21-303; Utah Code 10-21-304; Utah Code 10-21-101. We confirm the town's current rules for your property, including any internal ADU code adopted after that review, during preconstruction.
Utah ADU Law and Building Code
Where We Build
Newton and Cache County
Beyond Newton, our Cache County page explains which office issues the permit for an address and lists every community we serve there.
Cache County Permits and CommunitiesWhat Homeowners Ask
Newton Remodeling and Permit Questions
What lot standards apply to a new home in Newton?
Table 11-7-1 of the Land Use Ordinance sets minimums of 1 acre for a lot in the A-1 zone and 0.5 acre in R-1; 148 feet of frontage; and primary building setbacks of 20 feet in front, 15 feet on each side, and 10 feet in the rear. Lot coverage is capped at 50 percent in both zones. Section 11-8-3 permits only one main building on a lot unless the ordinance provides otherwise.
Does a retaining wall in Newton need a conditional use permit?
It does once it stands higher than 36 inches, under Section 11-8-5(B) of the town's Land Use Ordinance. Under Section 11-8-5(A), no fence, wall, or other similar structure in a required front, rear, or side yard may exceed 6 feet, except for the accessory buildings and structures the ordinance permits and except as a conditional use permit allows. Table 11-6-3 lists fences taller than 6 feet as a conditional use in the A-1 and C-1 zones and, in R-1, as not allowed unless another regulation of the zoning ordinance expressly permits them.
How soon does plan review start in Newton?
Newton's permit procedure puts each submitted application in a first-come, first-reviewed queue and states that review of all permits should start within 10 working days. The applicant is notified of any missing items. A member of the Newton Town Planning Commission reviews the site plan submitted with the application.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Newton
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Newton
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah