
Licensed Utah General Contractor
General Contractor in Santaquin, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Santaquin. We file each permit application with the Santaquin Building and Safety Division and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Santaquin
Every Santaquin project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
48.8 Percent of Santaquin Homes Built in 2010 or Later
Of Santaquin's 4,733 housing units, 48.8 percent were built in 2010 or later, including 14.8 percent in 2020 or later. Santaquin's median year built is 2009.
- Housing units
- 4,733
- Median year built
- 2009
- Built before 1980
- 13.4%
- Built 2000 or later
- 69.4%
- Owner-occupied
- 90.4%
- Single-family detached
- 81.4%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Santaquin, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Santaquin
The Santaquin Building and Safety Division reviews residential, commercial, and infrastructure plans, issues permits, and inspects the work. Applications are filed through the city's Online Application Portal.
Santaquin
Santaquin Building and Safety Division
Community Development shares the division's phone number and office. Inspections are scheduled by phone, with the permit number and address, at least 24 hours ahead during office hours. The site must be ready by 8 AM on the inspection day. An application goes to the Building Official once every required document is received. Permits are reviewed on a first-come, first-served basis.
- Phone
- 801-754-1011
- Address
- 110 South Center Street, second floor
- Hours
- Monday through Thursday, 9 AM to 5 PM, and Friday, 9 AM to 1 PM
- Portal
- Online Application Portal
Santaquin's basement finishing handout lists, in its own order, these items for the floor plan to show.
- The entire basement, cold storage included, with measurements of every planned and existing wall
- Every room, with its dimensions and its intended purpose labeled
- Electrical subpanels, none of them in a closet
- The mechanical room, with the furnace and water heater
- Every door
- The size and location of each window, with the sill heights above the floor noted
- Outlets, switches, and lights
- Each plumbed item, including toilets, showers, and sinks
- Where the appliances go, if a kitchen is added
- The width and location of each hallway
- The location of each smoke and carbon monoxide detector
- The total square footage to be finished
The handout also asks whether an added kitchen is for personal use or part of an accessory apartment that will be rented.
Source: Santaquin, Basement Finishing Building Permit Items to Submit.
Accessory Dwelling Units
ADU Rules in Santaquin
Section 10.16.080 of the Santaquin City Code allows one ADU per parcel, attached or detached, on an owner-occupied single-family property where the owner keeps either dwelling as a primary residence. For an attached ADU, the section sets these conditions.
- An attached ADU in any residential zone, only on a parcel with a single-family dwelling
- One off-street parking space for the unit's residents
- Up to two meters for each water and pressurized irrigation service
- Construction and remodeling that meet the building codes in effect at the time
- In a new home approved with an attached ADU, no separate entrance for the unit on the front or a street-facing side; a unit in an existing home may use existing entrances on any side
- A building permit, with a site plan drawn to scale showing the property lines and dimensions, existing buildings and their entrances, proposed buildings or additions with their distances to the property lines, parking stalls, and utility meters; and floor plans with every room's use labeled
- A permit for a preexisting attached unit when it is built on, is remodeled, or changes use, with an unpermitted unit inspected for life safety violations
- Basement rentals, caretaker apartments, and similar units counted as attached ADUs, a permitted use in every zone that permits single-family dwellings
Ordinance 09-01-2026, adopted September 15, 2026, and in effect since September 16, rewrote the detached ADU rules. A detached ADU is now permitted in the Main Street Residential area of the Main Street Business District zone and in the R-8 and R-10 zones. It is also permitted on any lot or parcel of 11,000 square feet or more that holds a single-family dwelling in another zone where that dwelling is a permitted use. The ordinance sets these conditions for it.
- A unit in the rear yard only, never subdivided from the home or sold separately, with the owner occupying either the home or the unit and no lease longer than two years without a renewal agreement
- A footprint of no more than 800 square feet and a total of no more than 1,600 square feet; a height no greater than the home's or 24 feet, whichever is less; and setbacks of at least 12 feet from the home and 10 feet from the side and rear property lines
- A permanent foundation, with recreational vehicles and mobile homes excluded
- An architectural style and color compatible with the home
- A unit connected to a detached garage, with the two together no taller than 24 feet whatever the home's height; no more than 1,600 square feet for the unit, garage area included; and any carport left out of that square footage but held to the same setbacks from the home and the side and rear property lines
- At least two off-street parking spaces for a unit of 650 square feet or more and one for a smaller unit, with tandem spaces not counted
- A home with a detached ADU allowed up to two meters for each water and pressurized irrigation service
- A trash can for the unit
- Building, fire, and health codes in effect at the time of construction
- A building permit with the same site plan and floor plans an attached unit needs
- The same permit and inspection rules for a preexisting unit
Utah's ADU statutes apply in Santaquin as well, as our ADU page explains.
Sources: Santaquin City Code, Section 10.16.080; Ordinance 09-01-2026; Ordinance 02-03-2026. The online code did not yet show Ordinance 09-01-2026 in October 2026. The detached rules above come from the adopted ordinance. We confirm them for your lot with the city during preconstruction.
Utah ADU Law and Building Code
Where We Build
Santaquin and Utah County
Beyond Santaquin, our Utah County page explains which office issues the permit for an address and lists every community we serve there.
Utah County Permits and CommunitiesWhat Homeowners Ask
Santaquin Remodeling and Permit Questions
Does Santaquin allow detached ADUs?
Yes, under the rules in effect since September 16, 2026. They allow one in the Main Street Residential area of the Main Street Business District zone, in the R-8 and R-10 zones, and on a lot of 11,000 square feet or more in any other zone where the lot's single-family dwelling is a permitted use. The unit goes in the rear yard, the owner lives in the home or the unit, and the parking it needs depends on whether the unit reaches 650 square feet.
Does a Santaquin basement finish need engineered plans?
Only for certain work. The city's basement finishing handout calls for plans signed and stamped by an engineer when the project cuts into an exterior wall to add a door or window, or replaces a load-bearing wall with a beam. Otherwise, the handout states that plans drawn by the applicant are accepted when they include every required item.
When should a Monday inspection be requested in Santaquin?
By 1 PM on the Friday before. When the schedule is already full, the city's office staff gives the next available date.
Does Santaquin offer timed inspections for a basement finish?
Yes. The city times inspections only for footings, foundations, and work whose inspection requires entering an occupied home, such as a basement finish or a remodel.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Santaquin
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Santaquin
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah

