Allegiant Construction builds every remodel, basement finish, addition, ADU, custom home, and commercial project on a written schedule, requests each inspection its permit requires, and warrants the work and materials for one year from substantial completion. You know where the project stands, what comes next, and what is required at each stage.

How We Build

Our Remodeling and Construction Process

Design and Preconstruction

Allegiant Construction aligns the required architecture, engineering, design, selections, and specifications with your budget and schedule before the contract is signed.

Construction

We lead every phase on site, manage project costs against the estimate, and report progress to you weekly.

Completion and Closeout

No project is closed out until every punch list item is finished to one standard.

Each service page sets out the inspections its work needs and lists its scope in construction order.

Inspections

The Inspections a Utah Building Permit Moves Through

Utah's residential code lists the inspections a permitted project must pass. Each stage waits for the building official's approval before the work it covers is concealed.

  1. Foundation

    Footings and foundations are inspected before any concrete is poured, under Section R109.1.1. The inspection comes once poles or piers are set or trenches or basement areas are excavated, and once any required forms and reinforcing steel are in place.

  2. Rough-In

    Plumbing, mechanical, gas, and electrical rough-in is inspected before anything is covered and before fixtures or appliances are set, under Section R109.1.2.

  3. Framing

    The framing inspection follows the approved rough-ins, once the roof, masonry, framing, firestopping, draftstopping, and bracing are in place, under Section R109.1.4.

  4. Exterior Envelope

    Utah adds an inspection of the weather-resistant exterior wall envelope and its flashing, under Section R109.1.5.1.

  5. Insulation

    Insulation is verified by inspection before interior finishes cover it, under Section R1102.4 of Utah's energy chapter.

  6. Fire-Rated Assemblies

    Where fire-resistance-rated construction is required between dwelling units or because of the property line, it is inspected after the gypsum board is hung and before its joints are taped, under Utah's Section R109.1.5.2.

  7. Final

    The final inspection comes after the permitted work is complete and before the space is occupied, under Section R109.1.6.

Local offices group and order these steps in their own way. Layton's basement finish handout, for example, combines the rough-ins and framing into one 4-Way Rough inspection before insulation, followed by the Insulation and Final inspections.

Sources: IRC Section R109 as adopted in Utah; Utah Code 15A-3-202; Utah Code 15A-3-203; Layton, Basement Finish Handout.

During Construction

While We Are in Your Home

These four practices apply on every project built while the household still lives in the home.

01

Your Hours Are Respected

Start and stop times are agreed before construction begins, and the crew keeps to them.

02

You Know Who Is Coming

You know which trade is scheduled, and on which day, before anyone arrives at your door.

03

Your Home Stays Livable

Work areas are sealed and dust is contained at the source. The rooms we are not working in stay clean and usable.

04

The Site Is Cleaned Daily

Debris is removed, work areas are swept, and your home is secured at the end of every working day.

After Closeout

One-Year Warranty on Work and Materials

Work and materials carry a one-year warranty that begins at substantial completion and is written into the Owner-Contractor Agreement.

If something covered by the warranty surfaces during that year, you call us directly, and we return to correct it.

What Homeowners Ask

Questions about Our Construction Process

Who schedules the inspections?

We do. Utah's residential code makes the permit holder, or an agent, responsible for telling the building official the work is ready. The person who requests an inspection must give the inspector access. We request each inspection and provide that access.

Can work continue before an inspection passes?

No. Each inspection point holds the work until the building official approves it. Under Section R109.4, anything that fails is corrected before it is covered or concealed.

Do I need to move out during construction?

A bathroom, kitchen, or basement project runs with the work area sealed off so the rest of the home stays livable. A full home renovation or a large addition can make relocating for part of the schedule the easier choice. We tell you that during preconstruction rather than after demolition starts.

What do the weekly reports include?

Photos and project updates in each report show the progress since the last one. You can follow every phase of construction without visiting the site.

What is substantial completion?

Substantial completion is the point at which the work is complete enough for you to use the space for its intended purpose, with only punch list items left. It is also when the warranty year begins.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation

Send the project details through the form to request a consultation.

Phone
801-835-4457
Hours
Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The city sets the permit office and the local rules.

Tell Us About the Project

Where the design stands, when you would like to start, and what you want built or changed.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation