Our Process
How We Work
Design and Preconstruction Construction Completion and Closeout
Allegiant Construction builds every remodel, basement finish, addition, ADU, custom home, and commercial project on a written schedule, requests each inspection its permit requires, and warrants the work and materials for one year from substantial completion. You know where the project stands, what comes next, and what is required at each stage.
How We Build
Our Remodeling and Construction Process
Design and Preconstruction
Allegiant Construction aligns the required architecture, engineering, design, selections, and specifications with your budget and schedule before the contract is signed.
Construction
We lead every phase on site, manage project costs against the estimate, and report progress to you weekly.
Completion and Closeout
No project is closed out until every punch list item is finished to one standard.
Each service page sets out the inspections its work needs and lists its scope in construction order.
Inspections
The Inspections a Utah Building Permit Moves Through
Utah's residential code lists the inspections a permitted project must pass. Each stage waits for the building official's approval before the work it covers is concealed.
Foundation
Footings and foundations are inspected before any concrete is poured, under Section R109.1.1. The inspection comes once poles or piers are set or trenches or basement areas are excavated, and once any required forms and reinforcing steel are in place.
Rough-In
Plumbing, mechanical, gas, and electrical rough-in is inspected before anything is covered and before fixtures or appliances are set, under Section R109.1.2.
Framing
The framing inspection follows the approved rough-ins, once the roof, masonry, framing, firestopping, draftstopping, and bracing are in place, under Section R109.1.4.
Exterior Envelope
Utah adds an inspection of the weather-resistant exterior wall envelope and its flashing, under Section R109.1.5.1.
Insulation
Insulation is verified by inspection before interior finishes cover it, under Section R1102.4 of Utah's energy chapter.
Fire-Rated Assemblies
Where fire-resistance-rated construction is required between dwelling units or because of the property line, it is inspected after the gypsum board is hung and before its joints are taped, under Utah's Section R109.1.5.2.
Final
The final inspection comes after the permitted work is complete and before the space is occupied, under Section R109.1.6.
Local offices group and order these steps in their own way. Layton's basement finish handout, for example, combines the rough-ins and framing into one 4-Way Rough inspection before insulation, followed by the Insulation and Final inspections.
Sources: IRC Section R109 as adopted in Utah; Utah Code 15A-3-202; Utah Code 15A-3-203; Layton, Basement Finish Handout.
During Construction
While We Are in Your Home
These four practices apply on every project built while the household still lives in the home.
01
Your Hours Are Respected
Start and stop times are agreed before construction begins, and the crew keeps to them.
02
You Know Who Is Coming
You know which trade is scheduled, and on which day, before anyone arrives at your door.
03
Your Home Stays Livable
Work areas are sealed and dust is contained at the source. The rooms we are not working in stay clean and usable.
04
The Site Is Cleaned Daily
Debris is removed, work areas are swept, and your home is secured at the end of every working day.
After Closeout
One-Year Warranty on Work and Materials
Work and materials carry a one-year warranty that begins at substantial completion and is written into the Owner-Contractor Agreement.
If something covered by the warranty surfaces during that year, you call us directly, and we return to correct it.
What Homeowners Ask
Questions about Our Construction Process
Who schedules the inspections?
We do. Utah's residential code makes the permit holder, or an agent, responsible for telling the building official the work is ready. The person who requests an inspection must give the inspector access. We request each inspection and provide that access.
Can work continue before an inspection passes?
No. Each inspection point holds the work until the building official approves it. Under Section R109.4, anything that fails is corrected before it is covered or concealed.
Do I need to move out during construction?
A bathroom, kitchen, or basement project runs with the work area sealed off so the rest of the home stays livable. A full home renovation or a large addition can make relocating for part of the schedule the easier choice. We tell you that during preconstruction rather than after demolition starts.
What do the weekly reports include?
Photos and project updates in each report show the progress since the last one. You can follow every phase of construction without visiting the site.
What is substantial completion?
Substantial completion is the point at which the work is complete enough for you to use the space for its intended purpose, with only punch list items left. It is also when the warranty year begins.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start
Request a Consultation
Send the project details through the form to request a consultation.
- Phone
- 801-835-4457
- Hours
- Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed - Based In
- West Jordan, Utah