Mount Timpanogos in the Wasatch Range above Utah County

How We Price

Cost-Plus Pricing for Remodeling and Construction in Utah

Estimate Contractor's Fee Actual Costs Draws Change Orders

Allegiant Construction builds most of its remodels, basement finishes, additions, ADUs, custom homes, and commercial projects on open-book, cost-plus terms. Your estimate is prepared after the walkthrough, the design, and your selections.

What You Pay

What Does Cost-Plus Mean in Construction?

Part One

Actual Costs

Labor, materials, equipment, subcontractors, and general requirements, billed as incurred. Project management and builder's risk insurance are billed at direct cost, never marked up.

Part Two

The Contractor's Fee

A fixed percentage of the cost of the work, agreed in writing before construction begins. Under our Investment Certainty guarantee, it does not change once the contract is signed.

Your Investment

One Open Ledger

Every invoice and receipt, itemized and open to you at any time. When actual costs come in under the estimate, the savings are yours.

The Terms

How Cost-Plus Works on an Allegiant Construction Project

These terms come from the proposal and the Owner-Contractor Agreement you receive before construction.

The Estimate

Your estimate prices the scope at current costs. It is non-binding and does not cap what the finished project costs.

Draws

Each draw bills the actual costs incurred, the contractor's fee, and project management as they come due. Every line is documented in full.

Change Orders

A change to the approved scope is written up with its cost and schedule effect for your approval before that work proceeds. The same applies to a condition uncovered behind the finishes of an existing building or below grade on new construction.

What Moves the Number

What Drives the Cost of a Utah Construction Project

Scope, site, existing conditions, and selections can put two projects of the same square footage far apart in cost.

Scope

What Is Being Built

The size of the project, any structural work, and the number of trades it calls for set the cost before a single finish is chosen.

Site and Location

Where It Is Built

Access, grade, soils, utilities, and the requirements of the city, town, or county where the property sits all carry cost.

Existing Conditions

What Is Already There

In an existing building, the condition of the framing, plumbing, mechanical, and electrical systems behind the finishes shapes what has to be corrected. On new construction, the soil below grade does.

Selections

What Goes into It

Windows, flooring, cabinetry, fixtures, and finishes each carry a cost set by the product and grade you choose.

What Homeowners Ask

Cost-Plus Pricing Questions

How much does a home remodel cost in Utah per square foot?

Square-foot figures leave out what sets the cost: scope, existing conditions, and selections. A written estimate for your scope gives you a number to plan around.

Do you publish prices or price ranges?

No. A range published before anyone has seen the property would be a guess. We price your actual scope in preconstruction.

Is the estimate the most I will pay?

No. You pay the actual cost of the work plus the contractor's fee. The final total can come in above or below the estimate.

What is the contractor's fee percentage?

It is agreed with you in writing before any work begins and stated in your agreement. We do not publish it.

What is a draw?

A draw is a scheduled payment request during construction.

Can a subcontractor put a lien on my home in Utah?

Utah's Residence Lien Restriction and Lien Recovery Fund Act bars a subcontractor or supplier from keeping a lien on an owner-occupied residence once the owner, under a written contract with a licensed contractor, has paid that contractor in full according to the contract.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation

Send the project details through the form to request a consultation.

Phone
801-835-4457
Hours
Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The city sets the permit office and the local rules.

Tell Us About the Project

Where the design stands, when you would like to start, and what you want built or changed.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation