How We Price
Cost-Plus Pricing for Remodeling and Construction in Utah
Estimate Contractor's Fee Actual Costs Draws Change Orders
Allegiant Construction builds most of its remodels, basement finishes, additions, ADUs, custom homes, and commercial projects on open-book, cost-plus terms. Your estimate is prepared after the walkthrough, the design, and your selections.
What You Pay
What Does Cost-Plus Mean in Construction?
Part One
Actual Costs
Labor, materials, equipment, subcontractors, and general requirements, billed as incurred. Project management and builder's risk insurance are billed at direct cost, never marked up.
Part Two
The Contractor's Fee
A fixed percentage of the cost of the work, agreed in writing before construction begins. Under our Investment Certainty guarantee, it does not change once the contract is signed.
Your Investment
One Open Ledger
Every invoice and receipt, itemized and open to you at any time. When actual costs come in under the estimate, the savings are yours.
The Terms
How Cost-Plus Works on an Allegiant Construction Project
These terms come from the proposal and the Owner-Contractor Agreement you receive before construction.
The Estimate
Your estimate prices the scope at current costs. It is non-binding and does not cap what the finished project costs.
Draws
Each draw bills the actual costs incurred, the contractor's fee, and project management as they come due. Every line is documented in full.
Change Orders
A change to the approved scope is written up with its cost and schedule effect for your approval before that work proceeds. The same applies to a condition uncovered behind the finishes of an existing building or below grade on new construction.
What Moves the Number
What Drives the Cost of a Utah Construction Project
Scope, site, existing conditions, and selections can put two projects of the same square footage far apart in cost.
Scope
What Is Being Built
The size of the project, any structural work, and the number of trades it calls for set the cost before a single finish is chosen.
Site and Location
Where It Is Built
Access, grade, soils, utilities, and the requirements of the city, town, or county where the property sits all carry cost.
Existing Conditions
What Is Already There
In an existing building, the condition of the framing, plumbing, mechanical, and electrical systems behind the finishes shapes what has to be corrected. On new construction, the soil below grade does.
Selections
What Goes into It
Windows, flooring, cabinetry, fixtures, and finishes each carry a cost set by the product and grade you choose.
Cost by Service
Utah Construction Costs by Service
Each service page lists the factors that set its cost, in the order the work is built.
Remodel
Add Space
Build
What Homeowners Ask
Cost-Plus Pricing Questions
How much does a home remodel cost in Utah per square foot?
Square-foot figures leave out what sets the cost: scope, existing conditions, and selections. A written estimate for your scope gives you a number to plan around.
Do you publish prices or price ranges?
No. A range published before anyone has seen the property would be a guess. We price your actual scope in preconstruction.
Is the estimate the most I will pay?
No. You pay the actual cost of the work plus the contractor's fee. The final total can come in above or below the estimate.
What is the contractor's fee percentage?
It is agreed with you in writing before any work begins and stated in your agreement. We do not publish it.
What is a draw?
A draw is a scheduled payment request during construction.
Can a subcontractor put a lien on my home in Utah?
Utah's Residence Lien Restriction and Lien Recovery Fund Act bars a subcontractor or supplier from keeping a lien on an owner-occupied residence once the owner, under a written contract with a licensed contractor, has paid that contractor in full according to the contract.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start
Request a Consultation
Send the project details through the form to request a consultation.
- Phone
- 801-835-4457
- Hours
- Mon: 9 AM to 5 PM
Tue: 9 AM to 5 PM
Wed: 9 AM to 5 PM
Thu: 9 AM to 5 PM
Fri: 9 AM to 5 PM
Sat: By appointment
Sun: Closed - Based In
- West Jordan, Utah