
Licensed Utah General Contractor
General Contractor in Pleasant Grove, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Pleasant Grove. We file each permit application with the Pleasant Grove Building Division and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Pleasant Grove
Every Pleasant Grove project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
47.5 Percent of Pleasant Grove Homes Built in 2000 or Later
Of Pleasant Grove's 11,821 housing units, 47.5 percent were built in 2000 or later and 25.4 percent before 1980. Pleasant Grove's median year built is 1999.
- Housing units
- 11,821
- Median year built
- 1999
- Built before 1980
- 25.4%
- Built 2000 or later
- 47.5%
- Owner-occupied
- 66.0%
- Single-family detached
- 59.6%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Pleasant Grove, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Pleasant Grove
The Pleasant Grove Building Division, part of the Community Development Department, reviews construction plans and processes every permit electronically through the city's Citizen Portal.
Pleasant Grove
Pleasant Grove Building Division
After an application is submitted, a permit technician reviews it and calls the applicant.
- Community Development
- 801-785-6057
- Address
- Community Development, 86 South 100 East
- Hours
- Monday through Thursday, 7:30 AM to 5:30 PM, and Friday, 8 AM to noon
- Portal
- Citizen Portal
The Building Division requires a permit for all new construction and lists this work as well.
- Single-family homes
- Commercial buildings, and new signs for them
- Additions and remodels
- Basement finishes
- Porches and decks
- Garages and carports
- Accessory buildings
- Sheds larger than 200 square feet
- Swimming pools and pool houses
- Retaining walls over 4 feet, measured from the bottom of the footing
- Fences over 6 feet high, measured from the bottom of the footing
- Any modification or alteration of a plumbing, heating, or electrical system
Source: Pleasant Grove, Building Division.
Accessory Dwelling Units
ADU Rules in Pleasant Grove
Pleasant Grove City Code Section 10-15-47, Accessory Apartments, covers internal and detached units together. Ordinance 2026-030, adopted October 6, 2026, rewrote its parking rules in Subsection J. Together they set conditions that include these.
- An apartment within or attached to a single-family home, or inside a detached accessory structure that goes with one
- The owner, listed with the Utah County Recorder and holding at least a 50 percent equity interest, using the main dwelling or the detached unit as a primary residence and mailing address, apart from a bona fide temporary absence of three years or less for a work assignment, sabbatical, or voluntary service after living there and with the intent to return
- One person, a group of related people, or up to four related or unrelated people living as a single housekeeping unit in the apartment, plus a temporary guest
- A location in the A-1, R-R, R-1, RM-7, DV, and Grove mixed housing zones only, never in a multi-family dwelling or on a lot that cannot meet the parking requirements
- One accessory apartment for each owner-occupied single-family home
- An apartment over the garage, in the basement, in an addition, or in a detached accessory unit, meeting the zoning requirements for a single-family neighborhood
- A separate, accessible entrance or stairway for a new home approved with an accessory apartment; in an existing structure, the current doors on a street-facing side, or a side or rear one; and no side-by-side front doors unless the second opens directly to the basement
- The home's address number, with the apartment as unit B, posted on the street side
- No added parking for an internal apartment when the home has four off-street spaces, one more space if it has fewer, and no garage converted to living area unless a new garage or carport is built before the conversion is occupied
- One added off-street space for a detached apartment of 650 square feet or less, and two for a larger one
- Parking kept out of a front or street-side yard setback except within an approved driveway, with covered stalls, garages, and up to two tandem spaces counted
- Parking paved with concrete or asphalt, or, for a space not directly connected to the street, surfaced with masonry, concrete pavers, or compacted material at least 4 inches thick that the City Engineer approves
- Eating, sleeping, and sanitation facilities separate from the main home
- Construction that meets the building codes in effect at the time, with Utah Code 10-20-606 applying to egress windows
- Separate water, gas, and electric meters allowed, each in the owner's name
- Interior access kept between the main living area and an attached apartment, unless the fire department finds sufficient means of egress during an inspection
- No separate sale or deed, with the apartment used only as a rental
- Registration with the Community Development Department in addition to the building permit, with a site plan, labeled floor plans, code corrections, and photos of the carbon monoxide and smoke alarms and the water heater's earthquake strapping
- A home occupation in the apartment limited to a home office that draws no customer traffic, and only with the property owner's express written permission
- A tiny home as the lot's one accessory apartment only when it is permanently connected to and approved for all required utilities; set on a site-built permanent foundation that meets the building code; inspected for the foundation, installation, and utility connections; and given parking under Subsection J
The city's Owner's Affidavit, completed with the Accessory Apartment Registration at the Community Development office, states that the accessory apartment permit is revoked if the property is no longer owner occupied.
Utah's ADU statutes apply in Pleasant Grove as well, as our ADU page explains.
Sources: Pleasant Grove City Code, Section 10-15-47; Ordinance 2026-030, Utah Public Notice Website; Owner's Affidavit. The city's ADU brochure and registration form predate Ordinance 2026-030. We confirm the current parking count and filing steps with Community Development for your property during preconstruction.
Utah ADU Law and Building Code
Where We Build
Pleasant Grove and Utah County
Beyond Pleasant Grove, our Utah County page explains which office issues the permit for an address and lists every community we serve there.
Utah County Permits and CommunitiesWhat Homeowners Ask
Pleasant Grove Remodeling and Permit Questions
Can I add a second kitchen in Pleasant Grove without an accessory apartment?
Yes, in the A-1, R-R, and R-1 zones, when the home meets every condition of City Code Section 10-15-37: one address, interior access to all parts of the home, no more than one electrical meter, and the second kitchen inside the primary structure, never in an accessory building. Once the second kitchen is approved, present and future owners limit the home to one family, with no roomers or boarders.
Does a basement finish need a building permit in Pleasant Grove?
Yes. Basement finishes are on the Building Division's list of work that requires a building permit, and the application goes through the Citizen Portal. The city's Basement Finish checklist lists items for the floor plans to show, including the area to be finished, the use of every room, door and window sizes and window types, bedroom egress, the electrical panel, the carbon monoxide alarm, and the combustion air duct to the mechanical room. The Building Division lists a site plan among the documents for new residential and commercial buildings and for most other types of construction. The Engineering Building Permit Checklist exempts work confined to existing interior space. We confirm with the city whether your basement finish needs a site plan.
How long is plan review for a new home in Pleasant Grove?
The Building Division states that initial plan reviews for single-family residential development are completed within 14 business days. Utah Code 10-20-909(4)(a) sets that limit for a one- or two-family dwelling or townhome, counted from the end of the 3-business-day screening period, unless the applicant waives it or agrees in writing with the city to another review period. Where the city gives notice of an incomplete application after 5 PM on the last day of the screening period, Subsection (4)(c) lets it pause the review in the last 5 days of the 14-business-day limit until the missing information arrives. We set your start date after the full review.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Pleasant Grove
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Pleasant Grove
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah

