
Licensed Utah General Contractor
General Contractor in Springville, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Springville. We file each permit application with the Springville Building Division and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Springville
Every Springville project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
33.3 Percent of Springville Homes Built before 1980
Of Springville's 11,320 housing units, 33.3 percent were built before 1980 and 43.9 percent in 2000 or later.
- Housing units
- 11,320
- Median year built
- 1996
- Built before 1980
- 33.3%
- Built 2000 or later
- 43.9%
- Owner-occupied
- 71.7%
- Single-family detached
- 65.1%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Springville, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Springville
The Springville Building Division takes every application through City Inspect and reviews only complete submittals, first come, first served. Electronic plans are left unsecured so city staff can add comments.
Springville
Springville Building Division
Inspections are requested in City Inspect at any time or by phone during office hours, Monday through Friday, 8 AM to 1 PM. The division recommends scheduling 48 hours ahead. It provides an inspection within three business days of receiving a request. A request sent between 5 PM Friday and 11:59 PM Sunday counts as received on Monday. Same-day inspections are not provided. Every sewer lateral is on a water test at its inspection. For a new Springville home, the city's Planning and Zoning and Storm Water departments approve the plans in City Inspect before the Building Division receives the project. We schedule both reviews ahead of the permit.
- Phone
- 801-489-2704
- Planning and Zoning
- 801-491-7861
- Portal
- City Inspect
Springville's Basement Improvement Permit Checklist states that a permit is required before an unfinished basement becomes habitable space or gains electrical, plumbing, or heating work. It lists these drawings and documents for the application.
- A site plan with setback measurements, locating the house and the improvements on the property, when a walkout is part of the permit
- A floor plan of the proposed area, with every space labeled for its intended use
- Engineering for beams that replace bearing walls
- Every window and door location
- The mechanical room or equipment location
- Electrical and gas information for the work being done
- Contractor information or an owner-builder certificate
- An ADU certificate application, where one applies
The checklist then lists the required inspections of footings where needed; underground plumbing; the four-way of framing and the plumbing, mechanical, and electrical rough-in; the gas line; insulation; and drywall, followed by the final inspection. A permit expires 180 days after it is issued or after the last inspection.
Accessory Dwelling Units
ADU Rules in Springville
Springville City Code Section 11-6-134, last amended by Ordinance 18-2025 on September 2, 2025, and the Land Use Matrix in 11-4-301 set these conditions.
- ADUs permitted in the A-1, R1-15, R1-10, R1-8, R1-5, R2, R-MF1, and R-MF2 zones
- An internal ADU converted from existing living area, built as an addition, or included in new construction of a single-family dwelling, with only conversion or new construction allowed in a twin home or townhome
- A detached ADU converted from part of an existing accessory building, added onto one, or included in a new one
- No recreational vehicle or mobile home used as an ADU, and every ADU in a detached accessory building on a foundation that meets the building code
- ADUs only on lots with one single-family detached or attached dwelling structure and no other dwelling structure
- No rental of an ADU for any period of less than 30 days
- One ADU on a lot with a single-family home
- An ADU never sold separately or subdivided from the principal single-family dwelling
- An owner occupant, holding 50 percent or more ownership by recorded deed or through a family trust, living in the home or the ADU as a primary residence, with suspension of this condition allowed after a year of residence for a bona fide temporary absence of three years or less or a stay in a hospital, nursing home, assisted living facility, or similar placement
- No more residents in the ADU than the code's definition of a family allows
- Home occupation businesses limited to a home office use that creates no customer traffic
- An ADU providing eating, sleeping, and sanitation facilities separate from the principal dwelling
- Registration with the Community Development Department and a zoning certificate
- Every requirement of local, state, and federal building and fire codes met
- At least one and no more than two meters for each water, gas, and electric service, each in the owner's name
- An addition built for an internal ADU within the zone's height, yard, and building coverage limits and other applicable land use rules
- Entrances to an internal ADU designed so the home still looks like a single-family dwelling
- At least one added on-site space for an internal ADU, measuring 9 by 18 feet or more, with tandem spaces allowed
- The accessory building setbacks of Sections 11-4-405 and 11-4-406 for a detached ADU, and a height of no more than 20 feet
- For a detached ADU, the residential site development regulations for accessory use structures, other applicable code sections, and the rules of the underlying zone and any overlay zone
- A detached ADU no larger than the city allows for an accessory building
- A detached ADU entrance facing an alley, a public street, or the rear of the house, or else a side or rear lot line at least 10 feet away, with exterior stairs kept 10 feet or more from those lines, except that the accessory building setback applies to the stairs along a line that adjoins an alley
- A minimum of two added on-site spaces for a detached ADU in the R1-10 and R1-15 zones, and at least one in every other zone, each 9 by 18 feet or larger, with tandem spaces allowed
- No detached ADU within a floodplain
- A zoning certificate application to Community Development first, then a building permit, with no certificate of occupancy until the zoning certificate is issued
- Documentation that an owner occupant lives on the property, and a notice recorded with the Utah County Recorder's Office for a lot approved for an ADU
Utah's ADU statutes apply in Springville as well, as our ADU page explains.
Sources: Springville City Code, Section 11-6-134; Land Use Matrix, Section 11-4-301; ADU and Short-Term Rental FAQ; Utah Code 10-21-304. We confirm the zone, setbacks, parking count, and zoning certificate steps for your property with Springville during preconstruction.
Utah ADU Law and Building Code
Where We Build
Springville and Utah County
Springville's Building FAQ directs owners of canyon property to the Utah County Building Division for permits. Beyond Springville, our Utah County page explains which office issues the permit for an address and lists every community we serve there.
Utah County Permits and CommunitiesWhat Homeowners Ask
Springville Remodeling and Permit Questions
Does Springville set a floor elevation on the west side of the city?
Yes. Under City Code Section 10-1-105, in the Westfields Overlay Zone and every other area west of 400 West Street or its planned alignment, the base floor elevation, whether for slab-on-grade construction or a crawl space floor, can be no lower than the top back of the curb. Subsection (2) lets commercial and multiple-family buildings set underground garages and slab-on-grade floors lower when its conditions are met. Subsection (3) allows a commercial building's base floor below the curb under separate habitable space, drainage, groundwater, and recorded release requirements. An approved moisture-proof membrane system that fully encapsulates the building's below-grade portions can take the place of the drainage and groundwater items, once a water infiltration test is performed and approved before any backfilling. We check a west-side lot against Section 10-1-105 before a new home or addition is designed.
What if an irrigation ditch crosses my Springville lot?
Under City Code Section 10-1-104, no building permit is issued for a property crossed or fronted by an irrigation ditch unless the construction plans provide for covering the ditch, with that design approved by the irrigation company or other easement owner.
How long is plan review for a Springville basement or addition?
The city's basement and addition brochures put plan review at approximately three weeks and say it may take longer if the city calls for corrections. We submit complete plans, since Springville does not accept incomplete applications for review.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Springville
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Springville
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah

