Mount Timpanogos in the Wasatch Range above Utah County

Licensed Utah General Contractor

General Contractor in Highland, Utah

Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects

Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Highland. We file each permit application with the Highland Building Division and request every inspection the permit requires.

What We Build

Remodeling and Construction Services in Highland

Every Highland project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.

Census Housing Data

91.7 Percent of Highland Households Own Their Homes

Of Highland's occupied homes, 91.7 percent are owner occupied. Highland's median year built is 2004. Homes built in 2000 or later make up 65.1 percent of Highland's 5,206 housing units.

Housing units
5,206
Median year built
2004
Built before 1980
9.8%
Built 2000 or later
65.1%
Owner-occupied
91.7%
Single-family detached
88.4%

Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Highland, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.

Permits and Inspections

Building Permits in Highland

The Highland Building Division takes permit applications online through City Inspect and begins its review once the application is complete with all of the required documentation.

Highland

Highland Building Division

The division rejects a permit application when the contractor's license is expired or revoked. An application still marked PREP has not been submitted and cannot be taken in for review. For submittals after December 3, 2024, Highland requires automatic fire sprinklers wherever the state fire code allows the city to require them, residences over 10,000 square feet included. We account for that rule in each custom home design.

Phone
801-772-4516
Address
5400 West Civic Center Drive
Hours
Monday through Thursday, 8 AM to 5 PM
Portal
City Inspect
Building Division

Highland's Basement Finish Checklist lists drawing requirements that include these.

  • A note on the architectural plans that the house is designed to the 2021 IRC as amended by the State of Utah
  • A dimensioned floor plan of the entire basement, existing finished areas included, with the square footage of the proposed work
  • An electrical plan locating every receptacle, light, and switch, the carbon monoxide and smoke detectors, and every electrical subpanel

Source: Highland, Basement Finish Checklist. Drawings missing any checklist item may not be allowed into plan review.

Accessory Dwelling Units

ADU Rules in Highland

For every ADU, Section 3-624 of the Highland Development Code, amended by Ordinance O-2026-28 on September 1, 2026, sets conditions that include these.

  • Registration of each ADU with the city, through an application and a recorded notice of approval that designates the addresses of both units, requires owner occupancy, and gives notice of the city's right to enforce these rules
  • A business license, and the city's short-term rental rules, for any rental of an ADU shorter than 30 consecutive days, with no business license needed for 30 days or longer
  • One ADU per residential property, internal or detached
  • An owner-occupied property, with the owner living in the primary dwelling or the ADU
  • A building permit, with inspection and approval by the Building Official and Fire Marshal before occupancy
  • No separate utility accounts, meters, or laterals; enough utility capacity for the unit; Utah County Health Department approval before an ADU is connected to a private septic system; and a connection of both units to the city sewer, at the owner's expense, if the owner cannot or does not meet the health department's septic requirements
  • An address for the ADU, separate from the primary dwelling's and set by the city
  • Any garage or carport parking lost to the ADU replaced on the property
  • No subdivision or separate transfer of the ADU from the property or the main dwelling

For an internal ADU, Section 3-624 adds these conditions.

  • Single-family residential property on a lot or parcel of at least 6,000 square feet
  • One off-street parking space for the internal ADU beyond the spaces the primary dwelling requires
  • No change to the front of the main dwelling that suggests a second unit, apart from separate addresses and mailboxes
  • The unit's primary entrance at the rear of the main dwelling, or at the side when fencing or landscaping hides it from the street

For a detached ADU, it adds these.

  • Single-family residential property on a lot or parcel of at least 11,000 square feet
  • An accessory building that meets the zone's accessory building rules, no taller than the lesser of the zone's accessory building height and the main dwelling's actual height
  • The main dwelling's setbacks, with the rear setback reducible to 20 feet for a single-story building no more than 15 feet tall
  • No placement between the main dwelling and the front property line, and a footprint no larger than the main dwelling's
  • Architecture complementary to the main dwelling
  • Conversion of an existing accessory building allowed when it conforms, or is made to conform, to every requirement of the section
  • A certificate of occupancy before the unit is used as a dwelling
  • No more than 1,250 square feet of living area
  • One off-street parking space for a unit smaller than 650 square feet, and two for one of 650 square feet or larger

Utah's ADU statutes apply in Highland as well, as our ADU page explains.

Sources: Highland Development Code, Section 3-624; Ordinance O-2026-28; Detached ADU Checklist. We confirm the lot size, setbacks, and parking for your property against Section 3-624 during preconstruction.

Utah ADU Law and Building Code
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

Highland and Utah County

Beyond Highland, our Utah County page explains which office issues the permit for an address and lists every community we serve there.

Utah County Permits and Communities

What Homeowners Ask

Highland Remodeling and Permit Questions

Do I need a permit to replace cabinets and countertops in Highland?

Not under the city's permit sheet dated April 30, 2026, which lists adding insulation, installing floor coverings, painting, replacing cabinets and countertops, and replacing plumbing fixtures as work that does not require a permit. The same sheet requires permits for basement finishes; water heater replacements; electrical, mechanical, and plumbing work; the replacement of windows or doors; and remodels that move walls or openings. It notes that its lists are not all-inclusive.

Does a breezeway make a Highland addition part of the house?

No. Highland's Development Code counts an addition as part of the main dwelling only when it shares the roof line and foundation, has at least four connecting walls and uninhibited interior access, and is attached along a majority of the side facing the original home. A structure connected by a breezeway or an underground connection is an accessory building.

How far ahead are Highland inspections requested?

At least 24 hours ahead, Monday through Thursday, in City Inspect or by phone. The Building Division's number is 801-772-4516. The division is closed Fridays, when inspections may be available by appointment.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation in Highland

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation