
Licensed Utah General Contractor
General Contractor in Cedar Hills, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Cedar Hills. We file each permit application with the Cedar Hills Building Department and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Cedar Hills
Every Cedar Hills project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
73.7 Percent of Cedar Hills Homes Built in 2000 or Later
Of the 2,651 housing units in Cedar Hills, 73.7 percent were built in 2000 or later and 7.9 percent before 1980. Single-family detached homes make up 84.3 percent of the housing in Cedar Hills. Owners occupy 88.8 percent of the occupied homes in Cedar Hills.
- Housing units
- 2,651
- Median year built
- Not available
- Built before 1980
- 7.9%
- Built 2000 or later
- 73.7%
- Owner-occupied
- 88.8%
- Single-family detached
- 84.3%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Cedar Hills, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Cedar Hills
The Cedar Hills Building Department reviews plans and issues permits through the city's iWorQ portal. Sunrise Engineering performs every inspection for the city.
Cedar Hills
Cedar Hills Building Department
Initial plan review can take up to 14 business days. Inspections are scheduled with Sunrise Engineering at least 24 hours ahead, never for the same day. The issued permit and the city-approved plans, digital or printed, are on site for every inspection.
- Phone
- 801-785-9668
- Inspections
- 800-560-6151
- Address
- 10246 North Canyon Road
- Portal
- iWorQ
The city's Basement Permit Requirements, revised August 19, 2022, list a completed, signed permit application and two sets of plans drawn to scale that show these items.
- Floor plans giving the size and label of every room
- A statement that the construction will comply with all applicable codes and local ordinances
- The construction methods, such as wood or steel framing, rigid insulation board, and drywall
- The insulation locations and R-values
- Engineering for every structural change
- All new and existing construction identified
- Window sizes, types, and well dimensions
- Ceiling heights
- Smoke and carbon monoxide detector locations
- The electrical panel locations, the lights, switches, outlets, and fans, with each GFCI labeled
- The plumbing fixtures, including future ones, and the locations of the water heater, floor drains, and water softener
- The HVAC equipment locations, with the supply and return duct design where it applies
- A gas line drawing for any change or addition to the existing system
- Documentation of energy code compliance
The sheet also notes that any exterior change needs HOA approval.
Source: Cedar Hills, Basement Permit Requirements, revised August 19, 2022.
Accessory Dwelling Units
ADU Rules in Cedar Hills
Section 10-5-32 of the Cedar Hills City Code, amended by Ordinance 07-07-2026C on July 7, 2026, sets conditions that include these.
- ADUs permitted in every residential zone in the city unless City Code or a development agreement prohibits them
- No homeowners association ban on ADUs in residential zones where they are otherwise allowed
- One ADU per lot or parcel, internal or detached
- A registration with a site plan showing the property lines and dimensions, existing buildings and their entrances, proposed additions, and tenant parking, and an affidavit that the home is owner occupied, without which the unit is not considered legal or approved
- A registration valid for the year it is first issued and renewed automatically each year after, on evidence that the owner occupies the home and on the city's determination that every condition of approval remains in effect
- A building permit before any new construction of an ADU begins, and a certificate of occupancy or certificate of completion before anyone occupies it
- An outside appearance unchanged from that of a single-family home, and no ADU in a multi-family dwelling or on a lot or parcel that cannot meet the parking requirements
- A dedicated entrance allowed on any side or the rear of the home, or at the front when it is below grade and keeps the home's single-family character
- The main home addressed as unit A and the ADU as unit B, under the same address number
- Interior access maintained when the ADU is inside the main dwelling
- The owner living in the primary dwelling or the ADU, with documentation provided when a trust owns the property
- An exception to owner occupancy while a family member lives at the home, after at least a year of residence and a temporary absence application filed before leaving, for three years or less on an activity such as a temporary work assignment, sabbatical, or voluntary service, or for a stay in a hospital, nursing home, assisted living facility, or similar facility
- Rental to one family unit only
- No more than one meter for each water, gas, and electric service, in the owner's name; no ADU where the home is served by a failing septic tank; and no detached unit that lacks adequate access to sanitary sewer, culinary water, electrical, or stormwater service or that connects to a system improvement lacking capacity
- One off-street tenant parking space for an internal ADU beyond those the home requires, and two for a detached ADU of 650 square feet or larger or one for a smaller one, with tandem parking in a driveway allowed and no parking in a front or side yard outside an approved driveway
- A registration that becomes void when the home is sold unless the buyer obtains a new permit, and an ADU that is never sold separately or detached by deed
Utah's ADU statutes apply in Cedar Hills as well, as our ADU page explains.
Sources: Cedar Hills City Code, Section 10-5-32; Ordinance 07-07-2026C, City Council Packet, July 7, 2026; City Council Minutes, July 7, 2026; Utah Code 10-21-303. Ordinance 07-07-2026C struck the section's earlier two-space minimum for every detached ADU. Section 10-5-32 sets no lot size, unit size, height, or setbacks for such a unit. We confirm the parking and the zone's accessory building rules for your property with the city during preconstruction.
Utah ADU Law and Building Code
Where We Build
Cedar Hills and Utah County
Beyond Cedar Hills, our Utah County page explains which office issues the permit for an address and lists every community we serve there.
Utah County Permits and CommunitiesWhat Homeowners Ask
Cedar Hills Remodeling and Permit Questions
Can my HOA stop an ADU in Cedar Hills?
Not where the city's residential zoning allows one, because Section 10-5-32 bars homeowners associations in Cedar Hills from prohibiting ADUs there. An exterior change such as a walkout still needs HOA approval wherever an HOA applies.
Can I act as my own contractor on a Cedar Hills rental property?
No. The city's permit portal requires a general contractor when the property is not the owner's primary residence.
How long does a Cedar Hills building permit stay valid?
The city's permit application states that a permit becomes null and void if the authorized work does not begin within 180 days, or if work is suspended or abandoned for 180 days at any time after it starts. We schedule each phase with that 180-day limit in view.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Cedar Hills
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Cedar Hills
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah

