Basement Remodeling in Utah

Allegiant Construction is a licensed Utah general contractor for full-scope basement remodels across Northern Utah. We remove only the finishes the new layout replaces, protect the stairs and the rest of your home, and rework the level on a written schedule.

What We Build

A Basement Remodel, in Construction Order

Scope covers demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.

  1. Demolition of Existing Finishes

    Carpet, flooring, drywall, ceilings, and partition walls that do not fit the new plan come out. Dust barriers protect the stairs and the rest of the house.

  2. Egress Corrections

    Each new bedroom or basement apartment in the plan gets the emergency escape and rescue opening the code requires. Where no existing window qualifies, the new opening is cut and installed before framing.

  3. Layout and Framing Changes

    New partition walls, soffits, and chases are framed to the approved plan. Any framing kept from the old layout is checked for level, fireblocking, and fit.

  4. Updated Plumbing, Mechanical, and Electrical

    Supply and drain lines, heating and cooling ducts, bathroom exhaust, circuits, and smoke and carbon monoxide alarms are extended or replaced for the new rooms. Each rough-in is inspected before the walls close.

  5. Insulation

    Foundation walls and rim joists are insulated to Utah's energy code where the old work fell short.

  6. Drywall and Hard Flooring

    New drywall is hung and finished. Tile or luxury vinyl plank rated for below-grade use then goes down over the slab.

  7. Finish Carpentry, Fixtures, and Carpet

    Interior doors, casing, baseboard, and built-ins are installed and painted; plumbing and light fixtures are set; and carpet goes in last, ahead of the final inspection.

Existing Conditions

What a Basement Remodel Uncovers

An older finished basement can hide unpermitted work, past water damage, and bedrooms built without an escape opening. We assess the existing conditions before the new design is final.

Past Work

Earlier Work without a Permit

Earlier basement work done without a permit is identified during preconstruction and included in the new permit application.

Moisture

Signs of Past Water

Stains, damaged framing, or musty finishes point to water. Its source is resolved before anything is rebuilt.

Egress

Bedrooms without an Exit

A new bedroom created in an existing basement needs an emergency escape and rescue opening under Utah's residential code. An existing operable window with a net clear opening of at least 4 square feet, 22 inches high, and 20 inches wide can serve as that opening. The exception in Section R310.1 lets a home with a Section P2904 sprinkler system omit the opening when the basement has two means of egress, or one means of egress and one escape opening. An older bedroom without one is a safety gap we recommend closing during the remodel.

Apartments

Converting to an Internal ADU

A remodel can add a bathroom, a kitchen, and a separate entrance and turn the level into an internal accessory dwelling unit. That option applies where the house is a detached single-family home that is the owner's primary residence.

2021 IRC as Adopted in Utah

Utah Building Code for Remodeling an Existing Basement

Utah's residential code sets out what an existing basement must change during a remodel and what it may keep.

Unaltered Work

Utah's amendment to Section R101.2 states that the code does not require changes to a building component that is not being altered. Existing work outside the remodel can stay as it is, except where a provision such as the smoke alarm rule reaches the whole house.

Altered Work

Everything the remodel adds or alters meets the requirements for new construction, and the work may not leave the house less compliant than it was before, under Section R102.7.1.

Egress for New Bedrooms

A new sleeping room or accessory dwelling unit created in an existing basement needs an emergency escape and rescue opening under Utah's version of Section R310.7. Other basement alterations do not trigger one. Under the exception in Section R310.1, a home sprinklered under Section P2904 may omit a basement sleeping room's opening when the basement has two means of egress, or one means of egress and one escape opening.

Existing Windows

An existing operable window with a net clear opening of at least 4 square feet, 22 inches high, and 20 inches wide is accepted as the escape opening for a new basement bedroom, under Sections R310.7 and R310.7.1.

Bedrooms Finished Earlier

In an existing bedroom, an egress window that met the code when the room was finished does not have to be enlarged if the change would compromise the structure, under Utah's Section R102.7.2. The same holds where the change could not be completed under the code's other applicable requirements, including its setback and window well rules.

New Egress Windows

A new escape opening provides at least 5.7 square feet of net clear opening and measures at least 24 inches high and 20 inches wide, with a sill no more than 44 inches above the floor, under Section R310.2. A grade-floor opening may provide 5 square feet. Section R202 defines it as an opening located such that the bottom of the clear opening is not more than 44 inches above or below the finished ground level adjacent to the opening.

Window Wells

The well in front of a below-grade egress window has at least 9 square feet of area and measures at least 36 inches in each direction, under Section R310.4. Under the same section, a well deeper than 44 inches gets a permanently affixed ladder or steps, which can encroach up to 6 inches into the well's required dimensions.

Well Ladders and Drainage

A ladder in a deep well has rungs at least 12 inches wide that project at least 3 inches from the wall and sit no more than 18 inches apart, under Section R310.4.2.1. The well drains to the foundation drainage system under Section R310.4.3, unless the home sits on well-drained sand or gravel soils. Under Utah's version of Section R405.1, that system is also not required where a geotechnical report has been provided for the property and does not require it.

Rebuilt Rooms

A bedroom or other habitable room in the new layout, kitchens aside, keeps at least 70 square feet and 7 feet in every horizontal direction, under Sections R304.1 and R304.2. Floor area under a furred ceiling lower than 7 feet does not count toward that minimum, under Section R304.3.

Ceiling Height

Habitable basement space and hallways need a ceiling of at least 7 feet, with beams, ducts, and other obstructions allowed down to 6 feet 4 inches; and basement bathrooms, toilet rooms, and laundry rooms need at least 6 feet 8 inches, under Section R305.1.

Stairs

Utah's amendments allow stair risers up to 8 inches with treads at least 9 inches deep, under Section R311.7.5. Headroom over the stairs stays at 6 feet 8 inches or more, under Section R311.7.2.

Replacement Water Heaters

A tank water heater whose leak would damage finished space sits in a pan, but a replacement heater needs no pan drain where none was installed before, under Sections P2801.6 and P2801.6.1.

Return Air

Under Section M1602.2, reworked ductwork takes no return air from a closet, bathroom, toilet room, kitchen, garage, mechanical room, boiler room, furnace room, or unconditioned attic. A kitchen-only return 10 feet or more from the cooking appliances is allowed, and so is a forced-air system dedicated to the garage that draws its return air there. The section also limits the return air taken from any room to the supply air delivered to it.

Unfinished Areas

Receptacles in any unfinished storage or mechanical room have GFCI protection, under Section E3902.5.

Insulation

Where the remodel opens or rebuilds the exterior basement walls, they meet the energy chapter Utah adopts in place of the IRC's: R-10 continuous or R-13 cavity insulation on the prescriptive path, or the REScheck or HERS performance path.

Smoke Alarms

A permitted basement remodel brings the home's smoke alarms up to the locations required for new homes, including every bedroom and every story, under Sections R314.2.2 and R314.3. The rule exempts a permit that covers only exterior, plumbing, or mechanical work. Alarms added this way may run on batteries as long as all of them sound together, under Sections R314.4 and R314.6.

Carbon Monoxide Alarms

Where the home has a fuel-fired appliance or an attached garage with an opening into the house, carbon monoxide alarms go on each level, outside each sleeping area, and inside any bedroom where a fuel-burning appliance sits in the room or its attached bathroom, under Sections R315.2.2 and R315.3. Alarms in existing areas that stay closed need not be interconnected unless an attic, crawl space, or basement gives access for interconnection, under Section R315.5.

Sources: Utah Code 15A-3-202, amendments to IRC Chapters 1 through 5; Utah Code 15A-3-203, energy chapter; IRC Chapter 1, existing structures; IRC Chapter 2, definitions; IRC Chapter 3 as adopted in Utah; IRC Chapter 28, water heaters; IRC Chapter 16, duct systems; IRC Chapter 39, GFCI protection.

How We Build

Our Remodeling and Construction Process

Every Allegiant Construction project moves through three phases, from the first measurement to the last punch list item. As your general contractor, we manage the permits, inspections, and schedule in each one.

Design and Preconstruction

We measure your space, produce permit-ready plans, and help you finalize every selection. We set the scope, the schedule, and the contractor's fee in writing and secure permits through the Authority Having Jurisdiction before demolition begins.

Construction

Demolition, framing, plumbing, mechanical, and electrical rough-in, and finishes proceed in sequence, with the work area sealed off and your questions answered the same day. Rough-in and framing pass their inspections before insulation and drywall cover them, and any change goes through a written change order before that work proceeds.

Completion and Closeout

We pass final inspection, walk the finished space together, create the punch list, and complete every remaining item. Your one-year warranty on work and materials begins at substantial completion, and warranty calls come directly to Allegiant Construction.

What It Can Become

What an Existing Basement Can Become

Each of the four directions below is designed after the existing finishes are assessed and before demolition begins.

Light

More Daylight Downstairs

Larger egress windows and window wells bring daylight into a level that never had enough.

Layout

A Modern Layout

Small, dated rooms are reworked into open living space that connects to the stairs.

Systems

Updated Systems

Old plumbing, ductwork, and wiring are replaced before the new finishes cover them.

Living

A Second Living Area

A media room, a wet bar, or a playroom fills the corners an older layout left unused.

Concept directions for planning, not past projects.

Design Choices

Basement Remodeling Options for a Utah Home

Each choice below is settled before demolition, when the framing and rough-in can still follow it.

Living Space

A family room, a media room, a game room, or a home gym.

Bedrooms and Bathrooms

A guest suite, a bedroom with its own egress window, and a full bathroom with a walk-in shower.

Kitchenette or Wet Bar

A wet bar or a kitchenette with appliance circuits, cabinetry, and a sink, or a full kitchen when the level becomes an internal ADU.

Work and Storage

A home office, a craft or hobby room, built-in storage under the stairs, and an unfinished mechanical room kept clear for service.

Light and Ceilings

Larger egress windows, drywall soffits that wrap the ductwork and beams at the heights the code allows, and recessed lighting.

Flooring

Tile, luxury vinyl plank, or carpet over a moisture-resistant pad.

How We Price

How Much Does a Basement Remodel Cost in Utah?

Most basement remodels are built on open-book, cost-plus terms, because the conditions behind the old finishes are not fully known until demolition. The contractor's fee is set in writing before work begins. Scope changes go through written change orders.

Demolition

The amount of existing finish that comes out sets the first part of the budget.

Moisture

Repairing water damage and its source adds to the cost before the new work begins.

Code Corrections

Cutting an escape opening for a new bedroom that has no qualifying window adds to the scope. So does any correction the plan includes for an older bedroom without egress, outdated wiring, or earlier work that fell short of code.

Layout Changes

Moving walls or plumbing costs more than refreshing finishes within the existing rooms.

Stairs and Ceilings

Rebuilding a stair or reframing soffits around ductwork to reach the required heights adds framing and drywall.

Selections

Flooring, cabinetry for a wet bar or kitchenette, and trim are priced from your choices.

The cost of a basement remodel in Utah depends on how much of the existing finish comes out, any water damage, the code corrections, the new layout, the stairs and ceilings, and your selections. A written, non-binding estimate follows a walkthrough of the basement.

How Cost-Plus Pricing Works
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

Basement Remodeling across Northern Utah

We remodel existing basements in every county below. Each project starts by confirming what was permitted when the level was first finished.

Basement Remodeling in Salt Lake County

Basement Remodeling in Utah County

Alpine, Highland, Lehi, Cedar Hills, American Fork, Pleasant Grove, Saratoga Springs, Lindon, Cedar Fort, Eagle Mountain, Vineyard, Orem, Provo, Fairfield, Springville, Mapleton, Spanish Fork, Salem, Payson, Woodland Hills, Genola, Elk Ridge, Spring Lake, Santaquin, and Goshen.

Utah County Permits and Communities

Basement Remodeling in Wasatch County

Hideout, Heber City, Interlaken, Midway, Center Creek, Charleston, Daniel, Independence, and Wallsburg.

Wasatch County Permits and Communities

Basement Remodeling in Summit County

Henefer, Coalville, Wanship, Silver Summit, Summit Park, Oakley, Peoa, Snyderville, Park City, Kamas, and Francis.

Summit County Permits and Communities

Basement Remodeling in Davis County

Basement Remodeling in Weber County

Pleasant View, North Ogden, Plain City, Farr West, Ogden Valley City, Harrisville, Marriott-Slaterville, Huntsville, Ogden, West Haven, Riverdale, South Ogden, Roy, Washington Terrace, Hooper, and Uintah.

Weber County Permits and Communities

Basement Remodeling in Morgan County

Mountain Green, Peterson, Croydon, Morgan, and Porterville.

Morgan County Permits and Communities

Basement Remodeling in Cache County

Lewiston, Cornish, Richmond, Clarkston, Trenton, Newton, Amalga, Smithfield, Hyde Park, North Logan, Logan, River Heights, Mendon, Providence, Millville, Nibley, Hyrum, Wellsville, and Paradise.

Cache County Permits and Communities

Basement Remodeling by City and Town

Every County and Community We Serve

What Homeowners Ask

Utah Basement Remodeling Questions

Can you add a bedroom to my basement?

Yes. A new basement bedroom needs an emergency escape and rescue opening under the residential code, unless the home has a Section P2904 sprinkler system and the basement has two means of egress, or one means of egress and one escape opening, under the exception in Section R310.1. Where no existing window qualifies, we cut and install the egress window and well as part of the project.

Can you update an old basement bathroom?

Yes. The old finishes and fixtures are removed to the framing. The bathroom is then rebuilt with an exhaust fan ducted outdoors, a waterproof shower membrane, tile, a vanity, and new fixtures.

Can you turn my basement into a rental unit?

Yes, when the house is a detached single-family home that is your primary residence and the unit meets the conditions your city, town, or county sets. Utah law makes an internal ADU in such a home a permitted use in areas zoned primarily for residential use, in cities and towns as well as in unincorporated county areas, as our ADU page explains.

What if my basement was finished without a permit?

Tell us at the consultation. We account for it in the new permit application. Any work that does not meet code is corrected during the remodel.

Do I need a permit to remodel a basement in Utah?

Yes. A permit is required to build new walls in a basement or to install, alter, or replace its plumbing, gas, mechanical, or electrical systems. We secure the permit through the office that issues permits for work at your address and close it at the final inspection.

Do I have to bring the whole basement up to code?

No. The work being done meets the current code. Utah's amendments state that building components not being altered do not have to change. Smoke alarms, and carbon monoxide alarms where they apply, are updated when the remodel needs a permit.

Does an existing basement bedroom need an egress window in Utah?

Not because of a remodel alone. Under Utah's version of Section R310.7, a remodel of an existing basement requires an emergency escape and rescue opening only for a new bedroom or accessory dwelling unit. Under the exception in Section R310.1, a new bedroom needs no opening of its own when the home has a Section P2904 sprinkler system and the basement has two means of egress, or one means of egress and one escape opening. An existing operable window with a net clear opening of at least 4 square feet, 22 inches high, and 20 inches wide can serve that new bedroom. Utah's Section R102.7.2 also lets an existing bedroom keep a window that met the code when the room was finished, where enlarging it would compromise the structure. The same applies where enlarging it could not be done in keeping with the code's other applicable requirements, its setback and window well rules among them.

Does a basement window well need a drain?

Yes, unless an exception applies. Section R310.4.3 requires each window well to connect to the home's foundation drainage system and waives the drain where the foundation sits on well-drained sand or gravel soils. Under Utah's version of Section R405.1, the foundation drainage system is also not required where a geotechnical report for the property does not call for one. We confirm how each well drains during preconstruction.

What ceiling height does a remodeled basement need?

Habitable space and hallways need at least 7 feet; beams and ducts can come down to 6 feet 4 inches; and bathrooms, toilet rooms, and laundry rooms need at least 6 feet 8 inches.

Does my water heater need a drain pan in a finished basement?

Yes, when a tank water heater is installed or replaced where a leak would damage the finished space. The pan is at least 1 1/2 inches deep and drains through a pipe of at least 3/4 inch. A replacement heater needs no pan drain where none was installed before. Under a gas-fired heater, a plastic pan needs a flame spread index of 25 or less and a smoke-developed index of 450 or less.

Can you move the ductwork when remodeling a basement?

Yes. Supply and return ducts are rerouted to serve the new rooms; return air is kept out of bathrooms, closets, and the mechanical room; and soffits are framed around the ducts that stay.

Do I have to replace my smoke alarms when I remodel the basement?

Yes, when the basement remodel needs a permit and covers more than exterior, plumbing, or mechanical work. The home then gets smoke alarms in every location a new home requires. The added alarms may be battery powered, provided every alarm in the home sounds when one does.

How long does a basement remodel take?

The schedule depends on how much comes out, what demolition uncovers, and the inspections the permit requires. It is set before work begins and managed through closeout under our Schedule Certainty guarantee.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

Related

Services and Areas Related to Basement Remodeling in Utah

How to Start

Request a Basement Consultation

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.