
Licensed Utah General Contractor
General Contractor in Roy, Utah
Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects
Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in Roy. We file each permit application with the Roy Building Division and request every inspection the permit requires.
What We Build
Remodeling and Construction Services in Roy
Every Roy project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.
- Remodel Bathroom Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; insulation; drywall and cement backer board; waterproofing; tile; cabinetry; countertops; finish carpentry; and fixtures.
- Remodel Kitchen Remodeling Demolition; layout and framing changes; plumbing, mechanical, and electrical rough-in; drywall; flooring; cabinetry; countertops; backsplash tile; finish carpentry; and appliance and fixture installation.
- Remodel Basement Remodeling Demolition of existing finishes; egress corrections where code requires them; layout and framing changes; updated plumbing, mechanical, and electrical systems; insulation; drywall; hard flooring; finish carpentry; fixtures; and carpet.
- Remodel Full Home Renovations Demolition; structural and layout changes; windows and doors; plumbing, mechanical, and electrical updates; insulation; drywall; and complete interior finish.
- Add Space Basement Finishing Egress windows and window wells; framing and soffits; plumbing, mechanical, and electrical rough-in; insulation; drywall; tile and hard flooring; finish carpentry; paint; fixtures; and carpet.
- Add Space Home Additions Excavation and foundation; framing; roof tie-in; windows and exterior envelope matched to the existing structure; plumbing, mechanical, and electrical rough-in; insulation; drywall; and interior finish.
- Add Space Accessory Dwelling Units Zoning and feasibility review; a foundation for detached units; framing; a separate exterior entrance; full plumbing, mechanical, and electrical systems; insulation; drywall; flooring; cabinetry and countertops; and finish.
- Build Custom Homes Site work; foundation; framing; roofing; windows and exterior envelope; plumbing, mechanical, and electrical systems; insulation; drywall; and all interior and exterior finish.
- Build Commercial and Tenant Improvements Demolition of existing improvements; layout and partition framing; plumbing, mechanical, and electrical modifications; fire protection adjustments; insulation; drywall; ceilings; paint; flooring; millwork; fixtures; and the final inspection.
Census Housing Data
84.0 Percent of Roy Households Own Their Homes
Of Roy's occupied homes, 84.0 percent are owner occupied. Roy's median year built is 1986. Single-family detached homes make up 79.3 percent of Roy's 13,605 housing units.
- Housing units
- 13,605
- Median year built
- 1986
- Built before 1980
- 42.3%
- Built 2000 or later
- 21.6%
- Owner-occupied
- 84.0%
- Single-family detached
- 79.3%
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for Roy, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.
Permits and Inspections
Building Permits in Roy
Roy's Building Division takes every permit application online through City Inspect. The portal also carries plan review responses, revisions, and inspection scheduling.
Roy
Roy Building Division
By legislative action, certain items must be approved by other groups or entities, such as the irrigation company, SWPPP management, the Development Review Committee for nonresidential site plans, water share appropriations, and power departments, before the division can accept an application. The initial review of submitted plans is completed within 14 business days after they are accepted for review. Inspections follow the approved plans and are requested in AM and PM blocks, with a pour time noted for concrete work so the inspector can be there first. Some inspection types cannot be scheduled until the previous required ones have cleared or passed. Before Roy approves a building permit for a home or other noncommercial property, the applicant shows proof of a purchased secondary water supply, or a certificate from the Roy Water Conservancy Subdistrict that none is available. We secure that document before the application goes in.
- Phone
- 801-774-1040
- Address
- Community Development Office, 5051 South 1900 West
- Portal
- City Inspect
Roy's Building Permit Information for Single-Family and Two-Family Dwellings, revised May 2024, lists these minimum items for the plans, in its own order.
- A permit application with contact numbers, contractor license numbers, and the use of the building
- A site plan or plot plan of 8 1/2 by 11 inches or larger
- A plan of the footings and foundation
- A floor plan for each floor
- Front, side, and rear elevations
- Wall cross sections and details
- Plumbing, electrical, and mechanical layouts
- The species and grade of lumber, with joist and beam sizes
- The insulation R-value for every exterior wall and ceiling and for floor areas over unconditioned space and outside air
- Energy compliance documentation by REScheck or another approved method, with Manual J and D calculations for the HVAC system
The city's Residential Additions and Remodels handout uses the same first eight items. For a remodel, it adds a plan of every area to be remodeled with the existing walls to be removed and the new walls to be built. It also asks for the insulation R-value of the ceiling, exterior walls, and floor assembly over unconditioned air space. The Residential Basement Finish handout asks that every room and area be classified as finished or not finished and that existing and new walls be identified. It also asks that the furnace, the water heater, and any electrical panel in the basement be shown, and that the mechanical room be isolated from the conditioned space. The handout also states that engineering is required for altering or removing any structural member, bearing wall, or portion of one.
Sources: Roy, Building Permit Information for Single-Family and Two-Family Dwellings; Residential Additions and Remodels; Residential Basement Finish; Roy City Online.
Accessory Dwelling Units
ADU Rules in Roy
Ordinance 26-9, adopted September 15, 2026, rewrote Roy's ADU rules. Table 17-1 lists a detached ADU as permitted in the RE-20 through R-5 zones, but not the RMH-1 zone, under these conditions, in its own order.
- A lot or parcel of 11,000 square feet or larger that already contains a primary dwelling
- Additional parking under Table 19-1 in Section 10-19-8, with one space for a unit of 649 square feet or less, or two side-by-side spaces for one of 650 square feet or larger, none of them within the required front setback
- Occupancy as the primary residence of the owner of record
- No more than one detached ADU per parcel
- Rentals of 90 consecutive days or longer
- A Rental Dwelling License
- The additional requirements of Sections 10-10-28(9) and 10-10-29, set out below
- A notice recorded with the county
Section 10-10-28(9) allows an accessory building to be used as a detached ADU only under these standards, in its own order.
- No larger than the primary dwelling unit on the same lot or parcel
- In the rear yard, 10 feet or more behind the primary dwelling unit and no less than 3 feet from the side and rear property lines, outside any public utility easement or other recorded easement, and never in the front or side yards
- A design consistent with the primary dwelling unit
- A legally constructed accessory structure allowed to be converted into a detached ADU, subject to the title's detached ADU sections
- Replacement elsewhere on site of the primary dwelling's required parking space when a legally constructed garage that held it is converted into a detached ADU
- A detached ADU that the city can prohibit when the unit will not have adequate access to required utility services, including sanitary sewer, culinary water, electrical, or storm water, or when the required utility lacks sufficient capacity for it
Section 10-10-28 also allows no separate utility connections or meters for accessory buildings. Section 10-10-29 holds every detached accessory building to one story and a height of no more than 18 feet to the top of the wall plate or 25 feet to the pitch of the roof. Table 17-1 lists an internal ADU as permitted in the same zones, within the footprint of a primary dwelling, including a garage that is habitable space connected to it by a common wall, under these conditions.
- An additional parking space under Table 19-1, outside the required front setback
- Occupancy as the owner of record's primary residence
- Rentals of the unit for 30 consecutive days or longer
- A Rental Dwelling License for the unit
- A notice recorded with the county for the unit
Utah's ADU statutes apply in Roy as well, as our ADU page explains.
Sources: Roy City Zoning Code, Section 10-17-1; Section 10-10-28; Section 10-10-29; Section 10-19-8; Ordinance 26-9; Utah Code 10-21-304. We confirm the zone, the lot area, and the accessory building coverage limit in Section 10-10-29 for your Roy property with the city during preconstruction.
Utah ADU Law and Building Code
Where We Build
Roy and Weber County
Beyond Roy, our Weber County page explains which office issues the permit for an address and lists every community we serve there.
Weber County Permits and CommunitiesWhat Homeowners Ask
Roy Remodeling and Permit Questions
When does Roy require a geotechnical report?
Section 10-10-37 of the zoning code requires one with an application for a permitted use, conditional use, site plan, building permit, or any other approval, permit, or license, for any land area or parcel with the potential for soils, earthquake, flood, or other discernible hazards. A registered or licensed geologist, soils engineer, or civil engineer prepares the report.
How long does Roy allow to finish a building's exterior?
One year. Under Section 10-10-18 of the zoning code, all exterior features of a building are completed, and the property is cleared of materials, debris, and equipment, within one year after construction authorized by an approval, permit, or license begins. We plan your project's exterior work to finish inside that year.
What hours can construction run in Roy?
Section 5-2-7 of the municipal code makes it unlawful, between 10 PM and 6 AM, to operate tools or equipment used in construction, drilling, repair, alteration, or demolition work on buildings, structures, or streets when the noise creates a disturbance within a residential area. We schedule every trade on your project outside those hours.
What We Guarantee
Signature Guarantees
Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.
All four are written into every proposal we deliver.
Investment Certainty
The contractor's fee is fixed once the contract is signed and does not change through completion.
Schedule Certainty
Your project schedule is established upfront and actively managed through completion and closeout.
Same-Day Communication
Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.
Progress Reports
Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.
Related
Services and Areas Related to Roy
Related Services
Service Areas
Project Planning

How to Start
Request a Consultation in Roy
Send the project details below to request a consultation.
- Send the Details Scope, address, and the schedule you have in mind.
- Set a Time A reply to arrange a visit to the property.
- Walk the Project A walkthrough, then a written scope, schedule, and estimate.
- Phone
- 801-835-4457
- Hours
- Sunday through Saturday
7 AM to 6 PM - Based In
- West Jordan, Utah

