The Wasatch Range in winter from Emigration Canyon, Salt Lake County

Licensed Utah General Contractor

General Contractor in South Salt Lake, Utah

Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects

Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in South Salt Lake. We file each permit application with the South Salt Lake Community Development Department and request every inspection the permit requires.

What We Build

Remodeling and Construction Services in South Salt Lake

Every South Salt Lake project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.

Census Housing Data

27.3 Percent of South Salt Lake Homes Built before 1960

Of South Salt Lake's 11,876 housing units, 27.3 percent were built before 1960. Homes built before 1980 make up 44.3 percent of South Salt Lake's housing. Renters occupy 61.8 percent of South Salt Lake's occupied homes.

Housing units
11,876
Median year built
1986
Built before 1980
44.3%
Built 2000 or later
37.1%
Owner-occupied
38.2%
Single-family detached
33.4%

Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for South Salt Lake, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.

Permits and Inspections

Building Permits in South Salt Lake

South Salt Lake issues its own building permits through the Community Development Department, which reviews each project for the building code, the fire code, engineering standards, and local ordinances.

South Salt Lake

South Salt Lake Community Development Department

Applications go through the online Building Permit Portal. Each application is filed with a signed and notarized property owner affidavit, digital design drawings, and site plans. The city reviews each complete submittal within 15 business days. Comments go by email to the contact named on it. Inspections are scheduled only by calling the inspection number, never by email, conversation, or staff voicemail. A request called in before 3 PM is considered for the next business day.

Permits
801-483-6063 ext. 2
Inspections
801-483-6032
Address
Building Permits office, 220 East Morris Avenue
Hours
Monday through Friday, 8 AM to 5 PM
Portal
Building Permit Portal
Apply for a Building Permit

The city requires a certificate of occupancy before a structure is occupied. Before one is issued, every required inspection is completed. The application is then submitted in person with all of these sign-offs, in the form's order, including any that do not apply to the project.

  • Planning and Zoning
  • The Fire Marshal
  • Engineering, with as-built plans, the hydrant meter returned, and an independent lab's culinary water test letter
  • The Mt. Olympus Improvement District, with a sewer release letter
  • Jordan Valley Water, with a release letter for the water hookup
  • Salt Lake Public Utilities
  • Building, for the electrical, plumbing, and mechanical work
  • Business Licensing, with a business license application for a commercial or residential rental project
  • The Salt Lake County Health Department, with an approval certificate for a commercial project

Sources: South Salt Lake, Certificate of Occupancy Application; Building Inspections; Building Permits.

Accessory Dwelling Units

ADU Rules in South Salt Lake

Ordinance 2024-01, adopted February 7, 2024, allows internal and external ADUs in South Salt Lake's R1 and RM districts, under conditions that include these, in its own order.

  • A single-family dwelling as the primary dwelling on the property
  • No more than one internal ADU and one external ADU on a lot or parcel
  • No short-term rental of the house or the ADU
  • A predevelopment application, evidence of owner occupancy, a building permit application, a rental business license application, and any other land use application that applies
  • No ADU within a mobile home, portable container, trailer, carport, canopy structure, or similar structure
  • No sublease of any part of the ADU by its occupants
  • The owner occupying the house or the ADU, except on a property whose principal use is a multifamily dwelling, or while the owner is on active military service or placed in a hospital, nursing home, assisted living facility, or similar facility that provides regular medical care, other than a retirement living facility or community
  • An internal ADU on a lot of at least 6,000 square feet that is at least 50 feet wide at all points from the front property line to the rear, with the unit located within the primary dwelling
  • One on-site parking stall for an internal ADU beyond the home's requirement, with no fewer than three off-street stalls in total and no added stall where the home already provides more than four
  • An exterior entrance under weather protection for an internal ADU
  • An external ADU on a lot of the same minimum area and width, no taller than the house or 20 feet, whichever is more restrictive, and no more than two stories
  • An external ADU of no more than 50 percent of the house's total square footage, not counting the garage, or 1,000 square feet, whichever is more restrictive, covering no more than half the rear yard
  • An external ADU at least 10 feet from the house and 5 feet from the side and rear lot lines, with one added on-site parking stall, no more than two bedrooms, and a location outside the front and corner side yards
  • Conversion of an existing accessory structure only where it meets the ADU setbacks for the district and the building codes

The city's ADU page also states that a second utility meter cannot be added for the ADU and that the Planning and Zoning Division must receive and process the ADU Predevelopment Application before a building permit may be processed. Utah's ADU statutes apply in South Salt Lake as well, as our ADU page explains.

Sources: South Salt Lake, Ordinance 2024-01; ADUs; ADU Predevelopment Application; Utah Code 10-21-303; Utah Code 10-21-304. During preconstruction, we confirm with the Planning and Zoning Division how the 50-foot width rule and the rest of these conditions apply to your lot.

Utah ADU Law and Building Code
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

South Salt Lake and Salt Lake County

South Salt Lake's own Fire Marshal's office reviews building plans and issues permits for buildings, sprinklers, and fire alarms. Beyond South Salt Lake, our Salt Lake County page explains which office issues the permit for an address and lists every community we serve there.

Salt Lake County Permits and Communities

What Homeowners Ask

South Salt Lake Remodeling and Permit Questions

What comes before the building permit for an ADU in South Salt Lake?

The ADU Predevelopment Application goes to the Planning and Zoning Division first. When the ADU needs a building permit, the predevelopment application includes a current title report and an ALTA survey, each issued within 30 days. The owner-occupancy affidavit is recorded with the Salt Lake County Recorder's Office before an ADU business license or building permit is approved.

How long does a South Salt Lake permit application stay valid?

The city's FAQ says applications are valid for only 180 days and that the applicant is responsible for providing a complete application and responding to the city's comments. We complete the application and answer each comment as part of the submittal.

How soon will South Salt Lake inspect my project?

Inspections are scheduled in the order the city receives the requests, and scheduling may take up to three business days. Each request names a morning window of 8:30 AM to noon or an afternoon window of noon to 3:30 PM. No work may be concealed until the inspection is approved, and the posted permit and the approved plans stay on site for every inspection.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation in South Salt Lake

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation