Box Elder Peak in the Wasatch Range, Utah, at last light

Licensed Utah General Contractor

General Contractor in West Bountiful, Utah

Remodels Basement Finishes Additions ADUs Custom Homes Commercial Projects

Allegiant Construction is a licensed Utah general contractor for full-scope remodels, basement finishes, additions, ADUs, custom homes, and commercial projects in West Bountiful. We file each permit application with the city's Community Development and Engineering office and request every inspection the permit requires.

What We Build

Remodeling and Construction Services in West Bountiful

Every West Bountiful project starts with a written scope, schedule, and estimate, then is built to one standard through closeout.

Census Housing Data

91.7 Percent of West Bountiful Homes Are Single-Family Detached

Of West Bountiful's 2,011 housing units, 91.7 percent are single-family detached. Homes built before 1980 make up 46.0 percent of West Bountiful's housing. Owners occupy 87.5 percent of West Bountiful's occupied homes.

Housing units
2,011
Median year built
1981
Built before 1980
46.0%
Built 2000 or later
20.6%
Owner-occupied
87.5%
Single-family detached
91.7%

Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates for West Bountiful, Tables B25001, B25003, B25024, B25034, and B25035, with the owner-occupied share measured against occupied homes and the other shares against all housing units.

Permits and Inspections

Building Permits in West Bountiful

Building permits in West Bountiful run through the city's Community Development and Engineering department. Sunrise Engineering, under contract with the city, reviews the plans for code compliance and performs the inspections.

West Bountiful

West Bountiful Community Development and Engineering

The Zoning Official reviews each submittal for zoning, the City Engineer checks its drainage and engineering, and the Building Official confirms that it conforms to the Building Code. Applications go by email to the city's permits address or in person to the City Offices. Plan review begins only once a complete package is received. Inspections are scheduled with Sunrise Engineering at least 24 hours ahead, with the permit number, site address, and type needed. The city requires a final inspection and approval by the building inspector before anyone occupies a new structure. West Bountiful requires a building permit for new construction, additions, remodels, basement finishes, and commercial office improvements.

Phone
801-292-4486
Inspections
800-560-6151
Address
City Offices, 550 North 800 West
Applications
By email or in person
Building Permits

The city's Building Permit Application Checklist calls for two copies of the plans and documents, or three of the site plan and building plans for a new home or commercial building. It asks for these items, in its own order, and ends with separate items for in-ground pools, solar arrays, and demolition.

  • The Building Permit Application, with its left side completed and signed, and an Owner/Builder Certification form when no general contractor is used
  • An 11-by-17-inch site plan with the address, a north arrow, and a legend; the easements, adjacent streets, parking, and existing and proposed structures with their dimensions; and every setback from the property lines, including the distance between the main and accessory buildings
  • The main floor and top back of curb elevations for comparison, or the street center where there is no curb, with the main floor required 12 inches above the high point of the top back of curb
  • The direction of surface drainage on final grade, a grading plan that relates the curb and gutter to the finished floors and grade, and finished ground elevations at a few points along the structure
  • Building plans at 11 by 17 inches, wet stamped and signed by a licensed engineer, with the height to the roof peak and the square footage of each level's finished, unfinished, garage, and covered porch or patio space
  • Structural calculations for any structural work
  • An energy analysis, with REScheck and Manuals D and J, when space is added or when new windows, doors, insulation, or other changes affect heating and cooling performance
  • A gas schematic showing the system type, size, length, and total BTU input
  • A completed Residential Storm Water Permit for construction activity

For a new home, the checklist adds three notes to the site plan. All design elevations, such as the curb, sewer, and natural ground, should be verified in the field before construction. Every sidewalk and driveway approach the project adds is concrete at least 6 inches thick over a 6-inch base course. The driveway's width is limited to 36 feet.

Sources: West Bountiful, Building Permit Application Checklist; Building Permits; Community Development and Engineering; Forms and Permits.

Accessory Dwelling Units

ADU Rules in West Bountiful

Under Chapter 17.82 of the West Bountiful Municipal Code, replaced in full by Ordinance 515-26 on September 15, 2026, an ADU that meets the chapter's standards is a permitted use wherever single-family housing is one, after the Land Use Administrator approves an accessory dwelling unit permit. Section 17.82.040 sets these standards for an internal ADU, in its own order.

  • The owner of record living on the property as a principal residence, apart from a business, medical, military service, or religious absence of up to three continuous years with an on-site manager designated, and never both the home and the ADU rented separately
  • One ADU per lot or parcel
  • Off-street parking under the residential parking rules of Chapter 17.52 and state law, with garage and driveway space counting; replacement parking when the unit is created in a garage or carport; outdoor stalls paved with concrete, masonry, asphalt, or concrete pavers, or surfaced with gravel; and at least one added off-street space designated for the ADU
  • No separate utility metering, with the service in the owner's name
  • A building permit, and the construction and housing codes in effect when the unit is built, designated as an ADU, or remodeled
  • Any separate entrance on the side or rear of the home, never facing the front yard
  • An ADU agreement on the city's form, recorded with the County Recorder, that runs with the land and requires a new owner to reapply and live on the property
  • A separate address using the letter B
  • Language in any lease ending it when the property is sold
  • Additions kept within the zone's lot coverage and setbacks
  • No short-term rental of the home or the unit, a term the city's ADU page defines as a rental or lease for less than 30 days

Section 17.82.050 carries over the same occupancy, one-unit, parking, short-term rental, agreement, address, lease, and lot coverage terms to a detached ADU, apart from the number of added spaces. The owner may live in either the home or the unit. The section adds these standards, in its own order.

  • A lot of at least 11,000 square feet in every single-family residential zone
  • A gross floor area of 201 square feet up to the smaller of 50 percent of the home's footprint or 1,000 square feet, counting the entire accessory structure that holds the unit, with garage, workshop, and storage space included
  • At least one added off-street parking space designated for a unit smaller than 650 square feet, and at least two for one larger than 650 square feet
  • No placement in the front yard
  • Rear setbacks of 30 feet in the A-1 and R-1-22 zones and 20 feet in the R-1-10 zone, and in each of those zones, 10 feet from a side property line, 20 feet from a street side property line, and 8 feet from the home
  • The height limit for a main structure in the zone
  • Conversion of an accessory building, such as a detached garage, that received a building permit on or before October 1, 2026, only where it was legally constructed and meets the detached ADU setbacks
  • A building permit, the same construction and housing codes, and no septic tank or other onsite wastewater disposal system

Utah's ADU statutes apply in West Bountiful as well, as our ADU page explains.

Sources: West Bountiful Municipal Code, Chapter 17.82; Ordinance 515-26; Accessory Dwelling Unit Application, revised October 2026; Accessory Dwelling Unit (ADU); Utah Code 10-21-304; Utah Code 10-21-101. We confirm the lot size, setbacks, sewer connection, and parking for your property with the city during preconstruction.

Utah ADU Law and Building Code
Map of the eight Northern Utah counties Allegiant Construction serves, with West Jordan markedGreatSalt LakeSALT LAKEUTAHWASATCHSUMMITDAVISWEBERMORGANCACHELoganOgdenLaytonSalt Lake CityPark CityHeber CityProvoMorganWest Jordan
Relief: U.S. Geological Survey, The National Map. County lines: U.S. Census Bureau.

Where We Build

West Bountiful and Davis County

Beyond West Bountiful, our Davis County page explains which office issues the permit for an address and lists every community we serve there.

Davis County Permits and Cities

What Homeowners Ask

West Bountiful Remodeling and Permit Questions

Does replacing windows in West Bountiful need a permit?

Not when the replacement requires no structural alteration. The city's Building Permits page also lists cabinet installation, minor repairs, painting, wallpapering, flooring, and roof shingle overlays as exempt. A roof replacement does need a permit.

Does West Bountiful's Airport Overlay Zone affect a building permit?

It can. Chapter 17.45 of the municipal code, adopted by Ordinance 496-24 on December 3, 2024, covers the airport influence area, the land within 5,000 feet of an airport runway. Development there conforms to 14 C.F.R. Part 77. As a condition of a building permit, the builder or developer may be required to grant or sell an avigation easement to the airport owner. The city notifies anyone building or developing land in that area, in writing, of aircraft overflights and the noise that comes with them.

How long does a West Bountiful building permit stay valid?

The city's Building Permits page says a permit is null and void when work does not begin within 180 days of issue; when the work is suspended, abandoned, or stopped for 180 days at any point after it starts; or when 180 days pass after the last inspection. The Building Official may consider an extension requested in writing before the 180 days run out, with good cause shown.

What We Guarantee

Signature Guarantees

Our Signature Guarantees define a refined construction experience built on clarity, accountability, and disciplined execution from start to finish.

All four are written into every proposal we deliver.

Investment Certainty

The contractor's fee is fixed once the contract is signed and does not change through completion.

Schedule Certainty

Your project schedule is established upfront and actively managed through completion and closeout.

Same-Day Communication

Project-related messages receive a same-day response, keeping communication clear, timely, and accountable.

Progress Reports

Weekly reports, photos, and project updates are delivered directly to you throughout every phase of construction.

How to Start

Request a Consultation in West Bountiful

Send the project details below to request a consultation.

  1. Send the Details Scope, address, and the schedule you have in mind.
  2. Set a Time A reply to arrange a visit to the property.
  3. Walk the Project A walkthrough, then a written scope, schedule, and estimate.
Phone
801-835-4457
Hours
Sunday through Saturday
7 AM to 6 PM
Based In
West Jordan, Utah
Allegiant Construction

Request a Consultation

  1. Project
  2. Location
  3. Details
  4. Contact

801-835-4457
Sunday through Saturday, 7 AM to 6 PM

What Are You Planning?

Choose the project closest to yours.

Where Is the Project?

The address sets the permit office and the local rules.

Tell Us About the Project

What you want built or changed, when you would like to start, and any drawings you already have.

Where Should We Reply?

Step 1 of 4
801-835-4457 Request a Consultation